Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  Traffic  
 All Current Incidents   Text Only
Accident Alert Roadwork Good Driving Fair Driving Difficult Driving Hazardous Driving Travel Not Advised Closure No Report Available
Entire Metro Area Northwest Northeast Southwest Southeast
Congestion levels can be found by clicking the "Traffic" tab.
All Current Incidents
Accident\Incident - Interstate 94
Interstate 94 eastbound: between Exit 235B Huron Boulevard and MN 280
crash

last updated today at 4:31 PM CDT
 
Accident\Incident - Interstate 494
Interstate 494 westbound: between Exit 4B Lyndale Avenue and Exit 5
crash

last updated today at 4:31 PM CDT
 
Accident\Incident - Interstate 694
Interstate 694 westbound: between 57th Avenue and Exit 36 East River Road
crash

last updated today at 4:16 PM CDT
 
Roadwork - Interstate 35E
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue
bridge construction — until December 31, 2015
Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE

last updated April 12
 
Roadwork - Interstate 35W
Interstate 35W southbound: between I-94 and Exit 16A
bridge construction, bridge closed -- follow the detour signs — until August 16
Comment: For more information CLICK HERE No OSOW Restrictions

last updated May 3
 
Roadwork - Interstate 94
Interstate 94: at Wisconsin State Line
major road construction — until November 15
Comment: For WisDOT West Central Freeway Construction Updates: Click Here

last updated today at 4:27 PM CDT
 
Roadwork - Interstate 494
Interstate 494: from Exit 1B 34th Avenue South to MN 100
major road construction — until September 30
Comment: Improvements to I-494 and replacement of the Xerxes Ave Bridge are underway. For more info and to sign up for email project updates CLICK HERE

last updated March 18
 
Roadwork - Interstate 694
Interstate 694 in both directions: from I-35W to Exit 104C Victoria Street
long term road construction Width limit 10 ' 0 " — until November 15
Comment: Will be ramp closures and non-peak lane closures. For more info CLICK HERE

last updated April 12
 
Roadwork - US 52
US 52 in both directions: at I-94, MN 803A
bridge construction — until September 15, 2014
Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed .

last updated May 9
 
Roadwork - US 61
US 61 in both directions: from after MN 55 to before US 10
bridge construction — until December 30
Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE

last updated November 30
 
Roadwork - MN 13
MN 13 in both directions: from Washburn Avenue to Nicollet Avenue
major road construction — until October 1
Comment: This is a Dakota County led project. For detailed information and to sign up for email updates: Click Here

last updated today at 4:15 PM CDT
 
Roadwork - MN 13
MN 13 in both directions: from Dakota County Road 5 to I-35W
construction work, left lane closed from 09:00am CDT to 03:00pm CDT on weekday — until Friday, at about 3:00 PM CDT
Comment: NO PERMIT RESTRICTIONS. Construction of Bypass in the Median

last updated May 17
 
Roadwork - MN 100
MN 100 in both directions: between Exit 14B 57th Avenue North and I-94
bridge construction, bridge closed — until August 16
Comment: Bridge closed. For more detailed information Click Here

last updated April 29
 
Alert - Interstate 35E
Interstate 35E southbound: from Exit 88A to Exit 88B Dakota County Road 42
road closed, bridge construction -- follow the detour signs — until June 2
Comment: For project and detour information and to sign up for email updates: Click Here

last updated May 9
 
Alert - Interstate 35E
Interstate 35E in both directions: from Exit 117 to Exit 120 Ramsey County Road J
roadway reduced to one lane because people are working in the median — until Friday, at about 7:00 PM CDT
Comment: NB I-35E between 5:00a - 2:00p SB I-35E between 11:00a - 7:00p No restrictions for OSOW vehicles.

last updated May 17
 
Alert - Interstate 94
Interstate 94 eastbound: at US 952A
left lane of exit ramp closed — until tomorrow at about 2:30 PM CDT
Comment: Bridge inspection each day in Hennepin/Lyndale ramp.

last updated yesterday at 7:43 AM CDT
 
Alert - Interstate 94
Interstate 94 eastbound: at Exit 229 West Broadway Avenue
roadway reduced to one lane, bridge inspection work is in progress — until tomorrow at about 2:30 PM CDT
Comment: Bridge inspection for Hennepin/Lyndale ramp.

last updated today at 4:02 PM CDT
 
Alert - Interstate 94
Interstate 94 in both directions: from MN 120 to I-494, I-694
roadway reduced to two lanes, bridge maintenance operations — until Thursday, at about 5:00 PM CDT
Comment: Crews will be installing structures for an overhead bridge to support a new electronic traffic sign for westbound traffic.

last updated May 14
 
Alert - Interstate 494
Interstate 494: from MN 77 to MN 100
roadway reduced to one lane, night time construction work — until Saturday, at about 6:00 AM CDT
Comment: The closures are from 7:00pm - 6:00am and are necessary as crews work in the center lanes of the freeway and on roadway medians and bridges.

last updated today at 11:25 AM CDT
 
Alert - MN 101
MN 101 in both directions: from after Hennepin County Road 14 to before MN 901B
road closed, road reconstruction — until November 15
Comment: No OSOW restrictions. This is a City of Chanhassen led project. For more information and to sign up for email project updates: Click Here

last updated April 25

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed, bridge construction on Interstate 35E southbound from Exit 88A to Exit 88B Dakota County Road 42 -- follow the detour signs — until June 2 last updated May 9 long term road construction on Interstate 694 in both directions from I-35W to Exit 104C Victoria Street — until November 15 last updated April 12 road closed, road reconstruction on MN 101 in both directions from after Hennepin County Road 14 to before MN 901B — until November 15 last updated April 25 bridge construction on US 61 in both directions from after MN 55 to before US 10 — until December 30 last updated November 30 bridge construction on US 52 in both directions at I-94, MN 803A — until September 15, 2014 last updated May 9 major road construction on Interstate 494 from Exit 1B 34th Avenue South to MN 100 — until September 30 last updated March 18 bridge construction on Interstate 35E in both directions from Exit 107C University Avenue to Exit 109 Maryland Avenue — until December 31, 2015 last updated April 12 major road construction on MN 13 in both directions from Washburn Avenue to Nicollet Avenue — until October 1 last updated today at 4:15 PM CDT roadway reduced to one lane on Interstate 35E in both directions from Exit 117 to Exit 120 Ramsey County Road J because people are working in the median — until Friday, at about 7:00 PM CDT last updated May 17 roadway reduced to one lane, night time construction work on Interstate 494 from MN 77 to MN 100 — until Saturday, at about 6:00 AM CDT last updated today at 11:25 AM CDT roadway reduced to one lane, bridge inspection work is in progress on Interstate 94 eastbound at Exit 229 West Broadway Avenue — until tomorrow at about 2:30 PM CDT last updated today at 4:02 PM CDT bridge construction, bridge closed on MN 100 in both directions between Exit 14B 57th Avenue North and I-94 — until August 16 last updated April 29 major road construction on Interstate 94 at Wisconsin State Line — until November 15 last updated today at 4:27 PM CDT roadway reduced to two lanes, bridge maintenance operations on Interstate 94 in both directions from MN 120 to I-494, I-694 — until Thursday, at about 5:00 PM CDT last updated May 14 crash on Interstate 694 westbound between 57th Avenue and Exit 36 East River Road last updated today at 4:16 PM CDT crash on Interstate 494 westbound between Exit 4B Lyndale Avenue and Exit 5 last updated today at 4:31 PM CDT crash on Interstate 94 eastbound between Exit 235B Huron Boulevard and MN 280 last updated today at 4:31 PM CDT construction work, left lane closed on MN 13 in both directions from Dakota County Road 5 to I-35W — until Friday, at about 3:00 PM CDT last updated May 17 left lane of exit ramp closed on Interstate 94 eastbound at US 952A — until tomorrow at about 2:30 PM CDT last updated yesterday at 7:43 AM CDT bridge construction, bridge closed on Interstate 35W southbound between I-94 and Exit 16A -- follow the detour signs — until August 16 last updated May 3 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints