| Roadwork & Maintenance Activities By Month. |
| Roadwork - Interstate 35E |
Interstate 35E northbound: from Exit 106BC Kellogg Boulevard to before I-94 exit ramp closed, road construction — until today at about 6:00 AM CDT Comment: 35E NB. , to the 11th. st. off ramp will be closed, sign installation. last updated September 7 |
| |
| Roadwork - Interstate 35W |
Interstate 35W in both directions: from Exit 10A 66th Street to Exit 14 East 36th Street long term road construction — until June 1, 2011 Comment: For additional information call the project hotline at 1-866-743-6590 or CLICK HERE last updated August 3 |
| |
| Roadwork - Interstate 35W |
Interstate 35W in both directions: at Chicago Avenue Overpass left lane closed, bridge construction — until today at about 5:00 AM CDT last updated yesterday at 1:16 PM CDT |
| |
| Roadwork - Interstate 35W |
Interstate 35W southbound: from MN 280 to MN 36 right lane closed, roadway reduced to two lanes, road construction — starting 10:00 AM, 09/09/10 until today at about 3:00 PM CDT last updated yesterday at 11:30 AM CDT |
| |
| Roadwork - Interstate 35W |
Interstate 35W southbound: from MN 280 to MN 36 road construction, right lane closed — starting 10:00 AM, 09/10/10 until tomorrow at about 3:00 PM CDT last updated yesterday at 11:35 AM CDT |
| |
| Roadwork - Interstate 35W |
Interstate 35W northbound: from Exit 26 Ramsey County Road E2 to I-694 right lane closed, bridge construction — starting 8:00 AM, 09/09/10 until today at about 11:00 AM CDT last updated yesterday at 12:58 PM CDT |
| |
| Roadwork - Interstate 35W |
Interstate 35W northbound: at Exit 31B Lake Drive exit ramp closed, road construction — last updated August 13 |
| |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: between MN 97 and Exit 131 Broadway bridge construction — for the next four months Comment: For more information on this Washington County-led project CLICK HERE last updated July 2 |
| |
| Roadwork - Interstate 94 |
Interstate 94 in both directions: from Exit 205 to I-494 road reconstruction, bridge construction, roadway reduced to two lanes — until October 29 Comment: Expect non-rush hour lane closures as crews resurface I-94, reconstruct the I-94 and Highway 101 interchange and construct new flyover bridge at I-94/Hwy 101. For additional information, CLICK HERE last updated June 17 |
| |
| Roadwork - Interstate 94 |
Interstate 94 westbound: from I-394 to Lowry Tunnel road construction Width limit 11 ' 0 " — until September 24 Comment: For more information CLICK HERE last updated September 7 |
| |
| Roadwork - Interstate 94 |
Interstate 94: from LaSalle Avenue to LaSalle Avenue bridge closed, bridge construction — until November 1 Comment: LaSalle Ave Bridge over I-94 closed for redecking. Watch for nightly lane closures on I-94 weather permitting. last updated July 27 |
| |
| Roadwork - Interstate 94 |
Interstate 94: from after I-35W to before Exit 234A Hiawatha Avenue bridge closed, bridge construction — until October 15 last updated July 27 |
| |
| Roadwork - Interstate 94 |
Interstate 94 in both directions: between I-35W and Exit 234A Hiawatha Avenue roadway reduced to two lanes, bridge construction — until today at about 5:00 AM CDT last updated yesterday at 1:13 PM CDT |
| |
| Roadwork - Interstate 94 |
Interstate 94 eastbound: from after Exit 234C Cedar Avenue to before Exit 235A Riverside Avenue right lane closed, bridge maintenance operations — starting 9:00 AM, 09/10/10 until tomorrow at about 2:00 PM CDT Comment: Starting 9:00AM, 09/07/10 until 2:00PM, 09/07/10. last updated September 7 |
| |
| Roadwork - Interstate 94 |
Interstate 94 westbound: from after Exit 234C Cedar Avenue to before Exit 235A Riverside Avenue right lane closed, bridge maintenance operations — starting 9:00 AM, 09/09/10 until today at about 2:00 PM CDT Comment: Starting - 9:00AM, 09/09/10 until 2:00PM, 09/09/10. last updated September 1 |
| |
| Roadwork - Interstate 94 |
Interstate 94 eastbound: from Ramsey County Road 16 to MN 95 road construction, right lane closed, roadway reduced to two lanes — starting 6:00 AM, 09/09/10 until today at about 10:00 AM CDT last updated yesterday at 11:44 AM CDT |
| |
| Roadwork - Interstate 94 |
Interstate 94 eastbound: from Ramsey County Road 16 to MN 95 road construction, right lane closed, roadway reduced to two lanes — starting 6:00 AM, 09/13/10 until Monday, at about 10:00 AM CDT last updated yesterday at 11:49 AM CDT |
| |
| Roadwork - Interstate 494 |
Interstate 494 westbound: at Exit 60 Lake Road roadway reduced to one lane, left lane of exit ramp closed, road construction — until September 23 Comment: Exit ramp is reduced to one lane from SB I-494 to Lake Road. last updated August 26 |
| |
| Roadwork - Interstate 694 |
Interstate 694 westbound: from MN 252 to MN 252 exit ramp closed due to road construction work — until Sunday, at about 11:45 PM CDT Comment: The ramp from WB 694 to NB 252 will be closed for concrete pavement rehabilitation. Use posted detour. last updated September 1 |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: from after Exit 40 Long Lake Road to I-35W right lane closed, bridge construction — starting 9:00 AM, 09/09/10 until today at about 10:00 AM CDT last updated yesterday at 1:18 PM CDT |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: at I-35W exit ramp closed, bridge construction -- northbound traffic, consider using an alternate route — starting 9:30 AM, 09/09/10 until today at about 11:00 AM CDT Comment: Loop from Eastbound 694 to Northbound 35W closed. Use alternate route. last updated yesterday at 1:24 PM CDT |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: at I-35W bridge construction, traffic restrictions in force Width limit 11 ' 0 " — until October 11 Comment: May be nighttime lane closures on Eastbound 694 and/or 35W weather permitting last updated September 7 |
| |
| Roadwork - Interstate 694 |
Interstate 694 westbound: from Exit 47 to before MN 120 left lane closed, left shoulder closed because of bridge maintenance work — starting 9:00 AM, 09/09/10 until today at about 2:00 PM CDT last updated yesterday at 1:52 PM CDT |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: from Exit 50 White Bear Avenue to MN 120 right lane closed, right shoulder closed, exit ramp closed, entrance ramp closed because of road maintenance activities — until today at about 5:00 AM CDT Comment: The on and off ramps from East 694 to and from White Bear Ave. will be closed last updated yesterday at 10:47 PM CDT |
| |
| Roadwork - Interstate 694 |
Interstate 694 in both directions: from MN 36 to I-494, I-94 roadway reduced to one lane, width limit in effect because of construction work Width limit 11 ' 0 " — until October 1 Comment: For more information CLICK HERE NB & SB traffic is a single lane each direction from 40th St. to TH 94. last updated July 22 |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: at MN 5 entrance ramp closed due to road construction work — until Monday, at about 6:00 PM CDT last updated July 23 |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: at Exit 57 10th Street North exit ramp closed because of construction work — until tomorrow at about 11:45 PM CDT last updated August 11 |
| |
| Roadwork - Interstate 694 |
Interstate 694 eastbound: at Exit 57 10th Street North entrance ramp closed because of construction work — until Monday, at about 10:15 PM CDT Comment: Follow detour. 10th St. N. entrance ramp to EB 694 will be closed. last updated September 2 |
| |
| Roadwork - US 10 |
US 10 eastbound: from 185th Avenue to Adams Street roadway reduced to one lane because the road is being repaved — starting 9:00 AM, 09/09/10 until today at about 9:00 PM CDT last updated yesterday at 4:14 PM CDT |
| |
| Roadwork - US 12 |
US 12 in both directions: from Hennepin County Road 90 to Hennepin County Road 83 road closed, long term road construction — until October 10 Comment: Follow detour. Eastbound detour: County 90 south to County 6 east and back to 12. Westbound detour: County 6 west to County 90 and north back to 12. Hwy. 12 open into the City of Maple Plain to County 83 and local businesses. For more information: CLICK HERE last updated June 24 |
| |
| Roadwork - US 52 |
US 52 in both directions: from after Eaton Street to after Plato Boulevard right lane closed, right shoulder closed because bridge inspection work is in progress from 09:00am CDT to 02:00pm CDT on weekday — starting 9:00 AM, 09/13/10 until September 17 Comment: The right lane and right shoulder of North and South 52 will be closed from Plato Blvd to W 7th St for bridge inspection last updated yesterday at 10:32 AM CDT |
| |
| Roadwork - US 61 |
US 61 in both directions: from US 10 to 70th Street roadway reduced to one lane, road construction, new road construction layout Vehicle length limit 75.0 ft, Width limit 10 ' 0 " — until September 17 Comment: All traffic will switch to the northbound roadway. last updated August 19 |
| |
| Roadwork - US 61 |
US 61 southbound: at Chemolite Road entrance ramp closed, road construction Width limit 10 ' 0 ", Vehicle length limit 75.0 ft — until September 22 last updated September 3 |
| |
| Roadwork - US 61 |
US 61 in both directions: from Ramsey County Road 27 to before Ramsey County Road 96 road construction, roadway reduced to one lane — until November 20 Comment: Permanent Single lane closure in both directions from Frost Ave. to White Bear Ave. last updated August 18 |
| |
| Roadwork - US 61 |
US 61 in both directions: from County Road 146 North to before Ramsey County Road 96 roadway reduced to one lane, width limit in effect due to bridge construction work Width limit 11 ' 0 " — until November 21 Comment: Closure is from Co. Rd. E to Co. Rd. F. Alternating lanes will be closed during the duration of the project. last updated August 18 |
| |
| Roadwork - US 61 |
US 61 in both directions: at Washington County Road 2 intersecting road closed, road construction -- follow local detour — until October 29 Comment: For more information:Click Here last updated July 19 |
| |
| Roadwork - US 169 |
US 169 southbound: from after Exit 136AB Bass Lake Road to before Exit 138 77th Avenue North left lane closed, left shoulder closed, roadway reduced to one lane, road maintenance operations — starting 6:00 AM, 09/12/10 until Monday, at about 6:00 AM CDT Comment: mill and patch day and night last updated yesterday at 4:08 PM CDT |
| |
| Roadwork - US 169 |
US 169 in both directions: from Exit 138 77th Avenue North to 93rd Avenue North long term road construction, bridge construction — until July 22, 2011 Comment: Bypasses, detours and possible daytime lane closures take effect as work progresses. For additional information CLICK HERE last updated May 24 |
| |
| Roadwork - MN 5 |
MN 5 in both directions: from I-694 to Jamaica Avenue road closed because of construction work — for a month Comment: Hwy 5 will be closed between Iris Ave. and Jamaca Ave. Follow posted detour at Jamaca and Hwy 5. Truck detour will be posted from Hwy 5 to Lake Elmo Ave. N. to Hwy 36 to Hwy 120 and back to Hwy 5. This closure is expected to reopen in October. last updated September 7 |
| |
| Roadwork - MN 7 |
MN 7 eastbound: from after Woodhill Road to Exit 16 right shoulder closed, exit ramp closed, work on the shoulder — starting 8:30 AM, 09/09/10 until today at about 2:30 PM CDT Comment: tree crew last updated yesterday at 5:07 PM CDT |
| |
| Roadwork - MN 7 |
MN 7 in both directions: from Exit 5CD to MN 100 road construction — until June 1, 2011 Comment: For more information about this project led by the city of St. Louis Park CLICK HERE last updated July 22 |
| |
| Roadwork - MN 36 |
MN 36 eastbound: from Exit 3 North Dale Street to I-35E left lane closed due to bridge construction work from 09:00am CDT to 03:00pm CDT on Tuesday, Wednesday, Thursday and Friday — until tomorrow at about 3:00 PM CDT Comment: Left lane closed due to materials and equipment moving for bridge construction. last updated September 1 |
| |
| Roadwork - MN 36 |
MN 36 eastbound: from Exit 3 North Dale Street to I-35E right shoulder closed due to road construction work from 06:00am CDT to 07:00pm CDT on Wednesday, Thursday and Friday — until tomorrow at about 7:00 PM CDT last updated September 7 |
| |
| Roadwork - MN 36 |
MN 36 westbound: from Exit 3 North Dale Street to before Exit 5AB right shoulder closed due to road construction work from 06:00am CDT to 07:00pm CDT on Wednesdays, Thursdays and Fridays last updated September 7 |
| |
| Roadwork - MN 47 |
MN 47 in both directions: from after Anoka County Road 2 to Anoka County Road 132 roadway reduced to one lane because of construction work from 09:00am CDT to 03:00pm CDT on Tuesday, Wednesday, Thursday and Friday — until tomorrow at about 3:00 PM CDT Comment: Construction work includes upgrades to pedestrian ramps at intersections from 44th Ave. to 85th Ave. last updated September 7 |
| |
| Roadwork - MN 55 |
MN 55 in both directions: between I-94 and Hennepin County Road 3 right lane closed, right shoulder closed, road maintenance operations — starting 9:00 AM, 09/09/10 until today at about 3:00 PM CDT Comment: Right Lane and Shoulder Closed EB and WB TH 55 E of 32nd St. last updated September 2 |
| |
| Roadwork - MN 55 |
MN 55 in both directions: from after MN 913A to before US 52 roadway reduced to one lane, left shoulder closed, road maintenance operations — starting 9:00 AM, 09/09/10 until today at about 2:30 PM CDT Comment: This is a moving operation. First the left lane of Eastbound and Westbound 55 will be closed, then the right lane. last updated yesterday at 11:51 AM CDT |
| |
| Roadwork - MN 62 |
MN 62 in both directions: at Exit 112B Portland Avenue bridge closed, bridge construction, entrance ramp closed, exit ramp closed — until October 1 Comment: Watch for nightly lane closures on Hwy 62 in both directions, weather permitting. Detour: Southbound Portland Ave: Eastbound 60th Street to Nicollet Ave to eastbound 66th Street Northbound Portland Ave: Eastbound 66th Street to Nicollet Ave to eastbound 60th Street last updated July 30 |
| |
| Roadwork - MN 62 |
MN 62 westbound: between Exit 112B Portland Avenue and Exit 113B Bloomington Avenue S new road layout — until tomorrow at about 6:15 PM CDT Comment: The ramp from westbound Hwy 62 to northbound 35W returns to a right-lane exit permanently on September 8. last updated September 7 |
| |
| Roadwork - MN 65 |
MN 65: at Anoka County Road 4 bridge construction, right shoulder closed — for the next six months Comment: Watch for shoulder and short-term lane closures as crews replace the pedestrian bridge spanning Central Ave. at 49th Ave. last updated September 7 |
| |
| Roadwork - MN 77 |
MN 77 northbound: from MN 13 to East Old Shakopee Road left lane closed because of bridge maintenance work — starting 9:00 AM, 09/14/10 until September 14 last updated yesterday at 9:12 AM CDT |
| |
| Roadwork - MN 77 |
MN 77 southbound: at East Old Shakopee Road right lane closed because of bridge maintenance work — starting 9:00 AM, 09/13/10 until Monday, at about 2:45 PM CDT last updated yesterday at 9:10 AM CDT |
| |
| Roadwork - MN 241 |
MN 241 westbound: from Wright County Road 19 to I-94 emergency maintenance, right lane closed Comment: Lane closure because of railroad tracks. cs last updated September 7 |
| |
| Roadwork - MN 252 |
MN 252 southbound: from Exit 35C to MN 610 roadway reduced to one lane because of construction work — starting 9:00 AM, 09/09/10 until today at about 7:00 PM CDT last updated yesterday at 4:16 PM CDT |
| |
| Roadwork - MN 252 |
MN 252 northbound: from after 77th Avenue to MN 610 left lane closed, construction work — until November 1 Comment: NB 252 Left Lane Closed From 83rd Ave. N to TH 610 last updated August 20 |
| |
| Roadwork - MN 610 |
MN 610: at US 169 road construction — for a long period Comment: For more information on the Hwy 610 extension project CLICK HERE last updated May 24 |