Roadwork - Interstate 35
Interstate 35 in both directions: between MN 97 and Exit 131 Broadway
bridge construction — for the next five months
Comment: For more information on this Washington County-led project CLICK HERE

last updated July 2
 
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction — until November 1
Comment: Removing and replacing the Hwy 95 bridge spanning I 35. For more information CLICK HERE

last updated June 24
 
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction, roadway reduced to one lane from 09:00am CDT to 03:00pm CDT on weekdays
Comment: Bridge work on substructures.

last updated June 29
 
Roadwork - Interstate 94
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75
road construction, bridge construction, delays — until December 15
Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here
last updated May 27
 
Roadwork - US 10
US 10 in both directions: from MN 15 to Sherburne County Road 20
road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1
Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here

last updated July 6
 
Roadwork - US 10
US 10 in both directions: from after Sherburne County Road 52 to before Sherburne County Road 81
road maintenance operations, roadway reduced to one lane — until August 12
Comment: Between Big Lake and Becker from 8 a.m. - 3:30 p.m. Monday through Thursday there are single lane closures/shifts with reduced speeds. Crews will be pothole patching the roadway.

last updated July 27
 
Roadwork - US 169
US 169: from Aitkin County Road 37 to MN 210
road construction, width limit in effect -- detour in operation, pilot car in operation, look out for flaggers — until August 6
Comment: TH 169 from.23 miles N of Garrison to TH 210 in Aitkin and TH 210 from 1000' W of 8th Ave. to Aitkin Co Rd 12, Approx 1 mile E of Jct. TH 169 and TH 210 in Aitkin. Intersection of TH 210 and Aitkin Co 12 will remain Open. Bituminous mill & overlay, turn lane construction, culvet repair & replacement. DETOUR Scheduled for 8/2/10 - 8/5/10. Aitkin Co . Rd 76 from South Jct to N Jct. of TH 169. Widith Limit of 12'. Restriction Dates: Th 169 7/12/10 - 9/30/10 Length of Project 17.6 miles, TH 210: 7/26/1- - 8/6/10 Length of Project 1.7 miles

last updated July 21
 
Roadwork - US 169
US 169: from US 2 to Itasca County Road 10
road construction, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until August 31
Comment: Traffic signal work at 13th Avenue NE in Grand Rapids. Drainage work near RR bridge east of the Prairie River. Curb and gutter work just north of Pokegama Lake.

last updated July 21
 
Roadwork - US 169
US 169: from MN 65 to MN 65
road construction, width limit in effect, paving operations -- look out for flaggers, observe signs Width limit 12 ' 0 " — until October 30
Comment: On TH 169 between Pengilly and Keewatin, milling and culvert replacement on the four lane section. Daytime lane closures with flaggers.

last updated July 21
 
Roadwork - MN 15
MN 15 in both directions: from Stearns County Road 47 to I-94
road construction, paving operations, width limit in effect, length limit in effect Width limit 8 ' 6 ", Vehicle length limit 85.0 ft — until August 17
Comment: TH 15 - in St. Cloud - from N. of CR 47/136 in St. Augusta to N. of TH 23 in St. Cloud - mill and overlay - permits - no over width and no over length from N. of CR 47/136 in St. Augusta to I94. The other part has night paving. Highway 15 from N. of Highway 23/Division St. to S. of the intersection of Highway 23/2nd St. South in St. Cloud night work begins July 26th. For more information Click Here

last updated July 22
 
Roadwork - MN 15
MN 15: from after Stearns County Road 74 to before Stearns County Road 134
road maintenance operations — until August 17
Comment: Periodic lane closures for a resurfacing project on Hwy 15 from Hwy 23/Division Street in St. Cloud to Stearns County Hwy 47/136 in St. Augusta. Day work begins the week of July 6 which includes lane closures, reduced speeds, flaggers and a pilot car directing traffic in rural portions. Night work begins the week of July 19 which includes lane closures/shifts from 9 p.m. - 6 a.m., reduced speeds and flaggers directing traffic. For more information: Click Here

last updated June 25
 
Roadwork - MN 23
MN 23: from after MN 15 to before Benton County Road 8
road construction, roadway reduced to one lane — until Monday, at about 10:00 AM CDT
Comment: Hwy 23 at the intersection of 28th Avenue in Waite Park, will be reduced to a single lane for signal revisions and the construction of turn lanes .

last updated July 16
 
Roadwork - MN 25
MN 25 in both directions: from after MN 7 to before Wright County Road 112
road construction — until Tuesday, at about 10:30 AM CDT
Comment: Resurfacing the roadway. Detour between State Street and White Street. Motorists will follow a signed detour via highway 7, Carver County 21, Wright County 10 and Wright County 30. For more information: Click Here

last updated May 13
 
Roadwork - MN 25
MN 25: from after MN 27 to Morrison County Road 43 - County Road 39
road construction, closed for vehicles with permits -- detour in operation — until August 16
Comment: Access to businesses provided via side streets & accessible crossings. Detour: Hwy 27, Centennial Dr., 3rd Ave. N., Vincent St., 4th Ave. N. . Grading, paving, lighting & water main work. Hwy 27 at Pierz to northern city limits. No oversize, overweight vehicles.

last updated yesterday at 11:29 AM CDT
 
Roadwork - MN 65
MN 65 in both directions: from MN 23 to before MN 27
road construction, paving operations, open to trucks with permits -- detour in operation, follow the detour signs — until October 15
Comment: Putting in culverts, grading, reclamation & surfacing. Road is open to local traffic only. Permits need to follow detour route - which is truck route - 23 - 47 - 27. The detour adds approximately 25 miles. Note: The construction ends at the southern intersection with TH 27 . For more information Click Here

last updated July 21
 
Roadwork - MN 65
MN 65: from US 169 to MN 1
road construction, width limit in effect, gross weight limit in effect, roadway reduced to one lane Width limit 10 ' 0 " — until October 29
Comment: From Nashwauk to Togo, daytime lane closures with flaggers. LEGAL WEIGHTS ONLY.

last updated July 21
 
Roadwork - MN 95
MN 95 in both directions: from Mille Lacs County Road 29 to Mille Lacs County Road 122
road construction, bridge construction, road reconstruction, width limit in effect, length limit in effect, height limit in effect -- detour in operation, follow the detour signs Width limit 8 ' 6 ", Vehicle length limit 85.0 ft, Height limit 13 ' 6 " — until November 18
Comment: Replacing bridge on TH 95 over Rum River and constructing a roundabout at CSAH 29 intersection. For more information Click Here Detour route: 95 - Mille Lacs CR 1 - Mille Lacs CR 13 - TH 169; no overwidth, overheight, overlength on detour route - cs

last updated July 21
 
Roadwork - MN 95
MN 95 in both directions: from after MN 65 to before Isanti County Road 19
road construction, road closed, closed for vehicles with permits -- detour in operation, follow the detour signs Vehicle length limit 85.0 ft, Height limit 13 ' 6 ", Width limit 8 ' 6 ", No vehicles over 80000 lbs daily — until August 15
Comment: Grading, resurfacing, accessability improvements and signal systems. No Permits. For more information:Click Here

last updated May 28
 
Roadwork - MN 243
MN 243 in both directions: at MN 95
bridge construction, roadway reduced to one lane, gross weight limit in effect -- look out for flaggers No vehicles over 20000 lbs daily — until tomorrow at about 6:00 PM CDT
Comment: Bridge is open to car and pickup traffic only. Trucks weighing more than 10 tons will continue to be detoured to the Hwy. 8 crossing in Taylors Falls.

last updated June 1
 
Alert - Interstate 35
Interstate 35: at MN 23
road closed, bridge construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until August 20
Comment: Bridge removal and re-construction at I-35 and the south jct. of MN 23, south of Hinckley. Starting July 27th, all ON and OFF ramps for I-35 at will be closed for a period of ten working days. Traffic will be detoured onto Pine County 61, Pine County 48 and also on I-35.

last updated July 21
 
Alert - Interstate 35
Interstate 35 in both directions: from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4
roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until September 15
Comment: On I-35 from Mahtowa to Sturgeon Lake NB I-35 will be routed onto SB I-35 with single lane traffic in each direction.

last updated July 26
 
Alert - US 61
US 61 in both directions: at Washington County Road 2
intersecting road closed, road construction -- follow local detour — until October 29
Comment: For more information:Click Here

last updated July 19
 
Alert - US 169
US 169: from Itasca County Road 10 to Itasca County Road 80
road closed, road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until August 9
Comment: TH 169 from Taconite to Calumet will be closed starting July 20th. Traffic will be detoured to CSAH 10 south to CSAH 70 east to CSAH 12 north for a total of 7-8 miles.

last updated July 20
 
Alert - MN 27
MN 27: from Morrison County Road 45 to MN 25
road closed to traffic, bridge construction -- detour in operation — until October 1
Comment: Reconstruction of Platte River Bridge, 3 miles West of Genola. Detour North of project via Morrison Co 45, Morrison County 43 and Morrison County Road 255. Legal Load Permits only per Morrison County. Detour Map: http://www.state.dot.mn.us/d3newsrel/2010/detours/Hwy27platteriverbridgedetour.pdf

last updated June 22
 
Slow - US 10
US 10 in both directions: from Morrison County Road 13 to Morrison County Road 76
bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays -- consider using an alternate route
Comment: Consider using an alternate route during this weekTraffic is restricted to a single lane is each direction with Flaggers. WB entrance ramp from Morrison CR 76 to WB Hwy 10 is closed. EB exit ramp to Morrison CR 76 is also closed. 12 ft. width restrictions in both directions. Wide loads may check Hwy 27 E or W or Hwy 115 N. at Camp Ripley or Hwy 371 N. to Hwy 210 E or W. DELAYS on Friday July 30, of 15 min each as new beams are being placed.

last updated yesterday at 11:05 AM CDT

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
road closed, bridge construction, width limit in effect on Interstate 35 at MN 23 -- detour in operation — until August 20 last updated July 21 road closed to traffic, bridge construction on MN 27 from Morrison County Road 45 to MN 25 -- detour in operation — until October 1 last updated June 22 road closed, road construction, width limit in effect on US 169 from Itasca County Road 10 to Itasca County Road 80 -- detour in operation — until August 9 last updated July 20 road construction, road closed, closed for vehicles with permits on MN 95 in both directions from after MN 65 to before Isanti County Road 19 -- detour in operation, follow the detour signs — until August 15 last updated May 28 intersecting road closed, road construction on US 61 in both directions at Washington County Road 2 -- follow local detour — until October 29 last updated July 19 bridge construction on Interstate 35 at MN 95 — until November 1 last updated June 24 bridge construction on Interstate 35 in both directions between MN 97 and Exit 131 Broadway — for the next five months last updated July 2 bridge construction, roadway reduced to one lane, gross weight limit in effect on MN 243 in both directions at MN 95 -- look out for flaggers — until tomorrow at about 6:00 PM CDT last updated June 1 road construction, paving operations, roadway reduced to one lane on US 10 in both directions from MN 15 to Sherburne County Road 20 — until December 1 last updated July 6 road construction, width limit in effect, gross weight limit in effect, roadway reduced to one lane on MN 65 from US 169 to MN 1 — until October 29 last updated July 21 bridge construction, roadway reduced to one lane on Interstate 35 at MN 95 last updated June 29 road construction, closed for vehicles with permits on MN 25 from after MN 27 to Morrison County Road 43 - County Road 39 -- detour in operation — until August 16 last updated yesterday at 11:29 AM CDT road construction, roadway reduced to one lane on MN 23 from after MN 15 to before Benton County Road 8 — until Monday, at about 10:00 AM CDT last updated July 16 road maintenance operations, roadway reduced to one lane on US 10 in both directions from after Sherburne County Road 52 to before Sherburne County Road 81 — until August 12 last updated July 27 road construction, bridge construction, delays on Interstate 94 in both directions from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 — until December 15 last updated May 27 roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions on Interstate 35 in both directions from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4 — until September 15 last updated July 26 bridge construction, width limit in effect, delays, slow traffic, roadway reduced to two lanes, delays on US 10 in both directions from Morrison County Road 13 to Morrison County Road 76 -- consider using an alternate route last updated yesterday at 11:05 AM CDT road construction, width limit in effect, single line traffic - alternating directions on US 169 from US 2 to Itasca County Road 10 — until August 31 last updated July 21 road maintenance operations on MN 15 from after Stearns County Road 74 to before Stearns County Road 134 — until August 17 last updated June 25 road construction, paving operations, open to trucks with permits on MN 65 in both directions from MN 23 to before MN 27 -- detour in operation, follow the detour signs — until October 15 last updated July 21 road construction, bridge construction, road reconstruction, width limit in effect, length limit in effect, height limit in effect on MN 95 in both directions from Mille Lacs County Road 29 to Mille Lacs County Road 122 -- detour in operation, follow the detour signs — until November 18 last updated July 21 road construction, paving operations, width limit in effect, length limit in effect on MN 15 in both directions from Stearns County Road 47 to I-94 — until August 17 last updated July 22 road construction on MN 25 in both directions from after MN 7 to before Wright County Road 112 — until Tuesday, at about 10:30 AM CDT last updated May 13 road construction, width limit in effect, paving operations on US 169 from MN 65 to MN 65 -- look out for flaggers, observe signs — until October 30 last updated July 21 road construction, width limit in effect on US 169 from Aitkin County Road 37 to MN 210 -- detour in operation, pilot car in operation, look out for flaggers — until August 6 last updated July 21 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints