Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

North Central
Central East Central
 
All Current Incidents
Roadwork - Interstate 35
Interstate 35: from Exit 249 Boundary Avenue to Exit 256A Mesaba Avenue
major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane -- trucks are recommended to avoid the area, drive with extreme caution Width limit 11 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: In Duluth from Boundary Avenue to 21st Avenue East, all traffic will be switched onto the NB lanes of I-35. Motorists are urged to proceed with caution due to construction activities and ramp closures. For more information CLICK HERE

last updated yesterday at 1:30 PM CDT
 
Roadwork - MN 61
MN 61: from I-35 to Saint Louis County Road 281
bridge construction, road closed to traffic, width limit in effect, length limit in effect -- follow the detour signs Width limit 12 ' 0 " — until Tuesday, at about 8:00 AM CDT
Comment: In Duluth at the Lester River bridge, traffic will be detoured from 60th Avenue East to Superior Street.

last updated August 31
 
Roadwork - MN 61
MN 61 in both directions: from after Lake County Road 106 to before Lake County Road 4
road construction, width limit in effect Width limit 14 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: Between Two Harbors and Beaver Bay single lane traffic with flaggers. Expect delays. Watch for contractor trucks entering and leaving the construction zone.

last updated August 16
 
Roadwork - MN 61
MN 61: at South Junction with County Road 59
road construction, width limit in effect, roadway reduced to one lane -- look out for flaggers Width limit 14 ' 0 " — until today at about 6:00 PM CDT
Comment: Grand Marias to Grand Portage single lane closures with flaggers.

last updated July 28
 
Roadwork - MN 135
MN 135: from MN 37 to MN 1
road construction, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until Tuesday, at about 8:00 AM CDT
Comment: On TH 135 between Gilbert and Tower, various sections of the highway will be reduced to one lane for culvert repair.

last updated August 31
 
Roadwork - MN 135
MN 135: from Saint Louis County Road 409 to MN 1
new road construction layout, width limit in effect -- look out for flaggers, entire intersection, near the lake Width limit 12 ' 0 " —
Comment: In Tower by Lake Vermilion, traffic will be switched onto a bypass for TH 135 during TH1/TH169 roadway and bridge construction.

last updated August 2
 
Alert - Interstate 35
Interstate 35 southbound: from Exit 252 Central Avenue to US 2
entrance ramp closed, major road construction — until October 30
Comment: Central Avenue ramp to SB I-35 is closed, detour to Cody St. to SB I-35.

last updated July 27
 
Alert - Interstate 35
Interstate 35: at I-535, US 53
exit ramp closed, major road construction — until October 30
Comment: On I-35 NB ramp to NB Hwy 53 - is closed, detour to 5th Avenue W & loop back. NB I-35 ramp to SB TH 535 to Superior is closed, detour to Hwy 2 or 27th Avenue W to Michigan St. to 21st Avenue W to I-535.

last updated July 27
 
Alert - US 2
US 2: from Skyline Drive to I-35
entrance ramp closed, road construction — until October 22
Comment: WB TH 2 ramp to SB I-35 is closed, detour to 1st St. to 40th Avenue West to I-35 NB or use Blatnik Bridge.

last updated July 27

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

bridge construction, road closed to traffic, width limit in effect, length limit in effect on MN 61 from I-35 to Saint Louis County Road 281 -- follow the detour signs — until Tuesday, at about 8:00 AM CDT last updated August 31 major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane on Interstate 35 from Exit 249 Boundary Avenue to Exit 256A Mesaba Avenue -- trucks are recommended to avoid the area, drive with extreme caution — until October 30 last updated yesterday at 1:30 PM CDT entrance ramp closed, road construction on US 2 from Skyline Drive to I-35 — until October 22 last updated July 27 entrance ramp closed, major road construction on Interstate 35 southbound from Exit 252 Central Avenue to US 2 — until October 30 last updated July 27 road construction, width limit in effect, roadway reduced to one lane on MN 61 at South Junction with County Road 59 -- look out for flaggers — until today at about 6:00 PM CDT last updated July 28 road construction, width limit in effect, single line traffic - alternating directions on MN 135 from MN 37 to MN 1 — until Tuesday, at about 8:00 AM CDT last updated August 31 exit ramp closed, major road construction on Interstate 35 at I-535, US 53 — until October 30 last updated July 27 new road construction layout, width limit in effect on MN 135 from Saint Louis County Road 409 to MN 1 -- look out for flaggers, entire intersection, near the lake — last updated August 2 road construction, width limit in effect on MN 61 in both directions from after Lake County Road 106 to before Lake County Road 4 — until October 30 last updated August 16 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints