| All Current Incidents |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: between MN 97 and Exit 131 Broadway bridge construction — for the next four months Comment: For more information on this Washington County-led project CLICK HERE last updated July 2 |
| |
| Roadwork - Interstate 90 |
Interstate 90 westbound: from after MN 56 to MN 16 road construction, roadway reduced to one lane, width limit in effect Width limit 10 ' 0 " — until September 15 Comment: Concrete Pavement Rehabilitation, Grinding and Biruminous Should Replacement last updated July 9 |
| |
| Roadwork - Interstate 94 |
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 road construction, bridge construction, delays — until December 15 Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here last updated May 27 |
| |
| Roadwork - US 10 |
US 10 in both directions: from MN 15 to Sherburne County Road 20 road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1 Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here last updated July 6 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Sherburne County Road 43 to 185th Avenue road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect Width limit 8 ' 6 ", Height limit 13 ' 6 ", No vehicles over 80000 lbs from 07:00am CDT to 07:00pm CDT on weekdays — until December 1 Comment: Highway 10 - from Big Lake to Elk River - Mill and Overlay - starting in mid August til approximately mid November. No permits on the construction project. Please visit for more information last updated August 12 |
| |
| Roadwork - MN 13 |
MN 13 southbound: from I-90 to MN 30 road construction, width limit in effect because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 31 Comment: Bituminous Mill & Overlay last updated August 3 |
| |
| Roadwork - MN 19 |
MN 19 eastbound: from MN 13 to MN 3 major road construction, width limit in effect, single line traffic - alternating directions -- pilot car in operation Width limit 10 ' 0 " — until September 15 last updated July 9 |
| |
| Roadwork - MN 23 |
MN 23: from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43 road construction — until September 17, 2012 Comment: Construct a four-lane divided highway bypass of Paynesville to include bridges and lighting. last updated August 26 |
| |
| Roadwork - MN 60 |
MN 60 westbound: from MN 13 to MN 21 road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 15 Comment: Grading, Bituminous Mill & Overlay and Culvert Repairs last updated August 3 |
| |
| Alert - Interstate 35 |
Interstate 35 in both directions: from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits -- consider using an alternate route — until September 14 Comment: Northbound and southbound traffic will be head-to-head on southbound lanes. Expect major delays during peak weekend travel times, including Friday and Sunday evenings. During backups use both lanes, take turns at merge. last updated July 27 |
| |
| Alert - Interstate 35 |
Interstate 35 southbound: from MN 97 to Exit 131 Broadway right lane closed, road construction — until today at about 5:00 PM CDT Comment: Bridge work. last updated August 31 |
| |
| Alert - Interstate 90 |
Interstate 90: from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast roadway reduced to one lane, major road construction, width limit in effect, length limit in effect Vehicle length limit 75.0 ft, Width limit 11 ' 0 " — until October 15 Comment: Daytime lane closures and traffic bypasses. For more information on this project CLICK HERE last updated April 16 |
| |
| Alert - US 14 |
US 14 in both directions: from after US 914A to before US 914A road closed, major road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until October 16 Comment: TH 14 is detoured from Waseca County Road 17 and Waseca County Road 14 . between Janesville and Waseca Follow the detour signs and be aware while driving in the work zone. last updated August 4 |
| |
| Alert - US 14 |
US 14: at I-35 exit ramp closed, entrance ramp closed, closed for vehicles with permits because of construction work -- detour in operation — until November 5 Comment: Detour Rotes: Westbound Hwy 14 to Southbound I-35 ramp traffic will be detoured South on County 45 and West on Hwy 30 Northbound I-35 to Eastbound Hwy 14 traffic will be detoured east on Hwy 30 and North on County 45 last updated April 26 |
| |
| Alert - US 52 |
US 52 in both directions: from MN 60 to before Goodhue County Road 9 roadway reduced to one lane, road reconstruction, width limit in effect Width limit 8 ' 6 " — until today at about 5:00 PM CDT Comment: Acceleration and turn lane construction on Highway 52 from 3350' North of Highway 57 to 1200' north of the south junction of highway 60. last updated July 26 |
| |
| Alert - US 61 |
US 61 in both directions: from MN 97 to US 8 roadway reduced to one lane from 07:00pm CDT to 07:00pm CDT on weekends and Fridays — Comment: Sealing bituminous pavement, opperations will run 24hrs a day. last updated August 27 |
| |
| Alert - US 61 |
US 61 in both directions: at Washington County Road 2 intersecting road closed, road construction -- follow local detour — until October 29 Comment: For more information:Click Here last updated July 19 |
| |
| Alert - MN 97 |
MN 97 in both directions: from I-35 to US 61 roadway reduced to one lane from 07:00pm CDT to 07:00pm CDT on weekends and Fridays — Comment: They will be working around the clock, work will conect up with the work on 61. last updated August 27 |