Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

West Central Central East Central
Southwestern Southeastern
 
All Current Incidents
Roadwork - Interstate 35
Interstate 35 in both directions: between MN 97 and Exit 131 Broadway
bridge construction — for the next four months
Comment: For more information on this Washington County-led project CLICK HERE

last updated July 2
 
Roadwork - Interstate 90
Interstate 90 westbound: from after MN 56 to MN 16
road construction, roadway reduced to one lane, width limit in effect Width limit 10 ' 0 " — until September 15
Comment: Concrete Pavement Rehabilitation, Grinding and Biruminous Should Replacement

last updated July 9
 
Roadwork - Interstate 94
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75
road construction, bridge construction, delays — until December 15
Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here
last updated May 27
 
Roadwork - US 10
US 10 in both directions: from MN 15 to Sherburne County Road 20
road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1
Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here

last updated July 6
 
Roadwork - US 10
US 10 in both directions: from Sherburne County Road 43 to 185th Avenue
road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect Width limit 8 ' 6 ", Height limit 13 ' 6 ", No vehicles over 80000 lbs from 07:00am CDT to 07:00pm CDT on weekdays — until December 1
Comment: Highway 10 - from Big Lake to Elk River - Mill and Overlay - starting in mid August til approximately mid November. No permits on the construction project. Please visit for more information

last updated August 12
 
Roadwork - MN 13
MN 13 southbound: from I-90 to MN 30
road construction, width limit in effect because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 31
Comment: Bituminous Mill & Overlay

last updated August 3
 
Roadwork - MN 19
MN 19 eastbound: from MN 13 to MN 3
major road construction, width limit in effect, single line traffic - alternating directions -- pilot car in operation Width limit 10 ' 0 " — until September 15

last updated July 9
 
Roadwork - MN 23
MN 23: from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43
road construction — until September 17, 2012
Comment: Construct a four-lane divided highway bypass of Paynesville to include bridges and lighting.

last updated August 26
 
Roadwork - MN 60
MN 60 westbound: from MN 13 to MN 21
road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 15
Comment: Grading, Bituminous Mill & Overlay and Culvert Repairs

last updated August 3
 
Alert - Interstate 35
Interstate 35 in both directions: from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street
roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits -- consider using an alternate route — until September 14
Comment: Northbound and southbound traffic will be head-to-head on southbound lanes. Expect major delays during peak weekend travel times, including Friday and Sunday evenings. During backups use both lanes, take turns at merge.

last updated July 27
 
Alert - Interstate 35
Interstate 35 southbound: from MN 97 to Exit 131 Broadway
right lane closed, road construction — until today at about 5:00 PM CDT
Comment: Bridge work.

last updated August 31
 
Alert - Interstate 90
Interstate 90: from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast
roadway reduced to one lane, major road construction, width limit in effect, length limit in effect Vehicle length limit 75.0 ft, Width limit 11 ' 0 " — until October 15
Comment: Daytime lane closures and traffic bypasses. For more information on this project CLICK HERE

last updated April 16
 
Alert - US 14
US 14 in both directions: from after US 914A to before US 914A
road closed, major road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until October 16
Comment: TH 14 is detoured from Waseca County Road 17 and Waseca County Road 14 . between Janesville and Waseca Follow the detour signs and be aware while driving in the work zone.

last updated August 4
 
Alert - US 14
US 14: at I-35
exit ramp closed, entrance ramp closed, closed for vehicles with permits because of construction work -- detour in operation — until November 5
Comment: Detour Rotes: Westbound Hwy 14 to Southbound I-35 ramp traffic will be detoured South on County 45 and West on Hwy 30 Northbound I-35 to Eastbound Hwy 14 traffic will be detoured east on Hwy 30 and North on County 45

last updated April 26
 
Alert - US 52
US 52 in both directions: from MN 60 to before Goodhue County Road 9
roadway reduced to one lane, road reconstruction, width limit in effect Width limit 8 ' 6 " — until today at about 5:00 PM CDT
Comment: Acceleration and turn lane construction on Highway 52 from 3350' North of Highway 57 to 1200' north of the south junction of highway 60.

last updated July 26
 
Alert - US 61
US 61 in both directions: from MN 97 to US 8
roadway reduced to one lane from 07:00pm CDT to 07:00pm CDT on weekends and Fridays —
Comment: Sealing bituminous pavement, opperations will run 24hrs a day.

last updated August 27
 
Alert - US 61
US 61 in both directions: at Washington County Road 2
intersecting road closed, road construction -- follow local detour — until October 29
Comment: For more information:Click Here

last updated July 19
 
Alert - MN 97
MN 97 in both directions: from I-35 to US 61
roadway reduced to one lane from 07:00pm CDT to 07:00pm CDT on weekends and Fridays —
Comment: They will be working around the clock, work will conect up with the work on 61.

last updated August 27

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
road closed, major road construction, width limit in effect on US 14 in both directions from after US 914A to before US 914A -- detour in operation — until October 16 last updated August 4 intersecting road closed, road construction on US 61 in both directions at Washington County Road 2 -- follow local detour — until October 29 last updated July 19 road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect on US 10 in both directions from Sherburne County Road 43 to 185th Avenue — until December 1 last updated August 12 bridge construction on Interstate 35 in both directions between MN 97 and Exit 131 Broadway — for the next four months last updated July 2 roadway reduced to one lane, major road construction, width limit in effect, length limit in effect on Interstate 90 from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast — until October 15 last updated April 16 roadway reduced to one lane on US 61 in both directions from MN 97 to US 8 — last updated August 27 road construction, width limit in effect on MN 13 southbound from I-90 to MN 30 because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers — until October 31 last updated August 3 road construction, roadway reduced to one lane, width limit in effect on MN 60 westbound from MN 13 to MN 21 -- pilot car in operation, look out for flaggers — until October 15 last updated August 3 road construction, paving operations, roadway reduced to one lane on US 10 in both directions from MN 15 to Sherburne County Road 20 — until December 1 last updated July 6 roadway reduced to one lane on MN 97 in both directions from I-35 to US 61 — last updated August 27 road construction, roadway reduced to one lane, width limit in effect on Interstate 90 westbound from after MN 56 to MN 16 — until September 15 last updated July 9 roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits on Interstate 35 in both directions from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street -- consider using an alternate route — until September 14 last updated July 27 roadway reduced to one lane, road reconstruction, width limit in effect on US 52 in both directions from MN 60 to before Goodhue County Road 9 — until today at about 5:00 PM CDT last updated July 26 road construction, bridge construction, delays on Interstate 94 in both directions from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 — until December 15 last updated May 27 major road construction, width limit in effect, single line traffic - alternating directions on MN 19 eastbound from MN 13 to MN 3 -- pilot car in operation — until September 15 last updated July 9 exit ramp closed, entrance ramp closed, closed for vehicles with permits on US 14 at I-35 because of construction work -- detour in operation — until November 5 last updated April 26 right lane closed, road construction on Interstate 35 southbound from MN 97 to Exit 131 Broadway — until today at about 5:00 PM CDT last updated August 31 road construction on MN 23 from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43 — until September 17, 2012 last updated August 26 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints