Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 All Current Incidents   Text Only
 
Accident
Alert
Closure
Roadwork
Difficult Driving
Fair Driving

West Central Central
South Central
 
All Current Incidents
Roadwork - Interstate 90
Interstate 90 in both directions: from after MN 4 to before Exit 128
road maintenance operations -- trucks are entering the roadway — until October 5
Comment: Crews working in ditch or shoulder area to repair culverts on I-90 from near Sherburn to Jct of Hwy 254 . Watch for equipment moving.

last updated August 6
 
Roadwork - US 59
US 59: from after Yellow Medicine County Road 3 to before MN 67
road construction -- detour in operation, follow the detour signs — until September 30
Comment: Shoulder widening and culvert lining.

last updated August 26
 
Roadwork - MN 23
MN 23: from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33
road construction -- detour in operation, follow the detour signs Vehicle length limit 75.0 ft, Height limit 13 ' 6 ", Width limit 8 ' 6 ", No vehicles over 80000 lbs — until October 31
Comment: Construct four-lane segments, pedestrian underpass, surfacing, lighting and signals.

last updated August 26
 
Roadwork - MN 60
MN 60: from Nobles County Road 4 to before US 59
new road layout -- trucks are entering the roadway — until November 6
Comment: Milemarker 2-9. New road construction near old involving heavy equipment.

last updated April 6
 
Roadwork - MN 60
MN 60 eastbound: from I-90 to Jackson County Road 13
road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits Width limit 8 ' 6 " — until October 10
Comment: SP 3204-64 Bituminous Mill and Overlay TH 60 EBL Worthington to Wilder. 2-way traffic on west bound lanes from Worthington to Heron Lake. Over-width & Over-length loads not permitted.

last updated August 19
 
Roadwork - MN 68
MN 68: from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B
road construction -- detour in operation, follow the detour signs Width limit 11 ' 0 ", Axle weight limit 20000 lbs — until October 8
Comment: Type of work: mill and overlay, sanitary and storm sewer

last updated August 26
 
Alert - US 71
US 71 in both directions: from Cottonwood County Road 25 to before MN 60
road closed, bridge construction, width limit in effect -- detour in operation, follow the signs Width limit 12 ' 0 " — until October 15
Comment: Bridge Replacement Windom TH 71 South: Outhbound detour from TH 71 onto Cottonwood County 17, south to Jackson County 30, east to rejoin TH 71.

last updated July 28

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed, bridge construction, width limit in effect on US 71 in both directions from Cottonwood County Road 25 to before MN 60 -- detour in operation, follow the signs — until October 15 last updated July 28 road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits on MN 60 eastbound from I-90 to Jackson County Road 13 — until October 10 last updated August 19 road construction on US 59 from after Yellow Medicine County Road 3 to before MN 67 -- detour in operation, follow the detour signs — until September 30 last updated August 26 road maintenance operations on Interstate 90 in both directions from after MN 4 to before Exit 128 -- trucks are entering the roadway — until October 5 last updated August 6 road construction on MN 68 from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B -- detour in operation, follow the detour signs — until October 8 last updated August 26 road construction on MN 23 from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33 -- detour in operation, follow the detour signs — until October 31 last updated August 26 new road layout on MN 60 from Nobles County Road 4 to before US 59 -- trucks are entering the roadway — until November 6 last updated April 6 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints