Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  Traffic  
 All Current Incidents   Text Only
Accident Alert Roadwork Good Driving Fair Driving Difficult Driving Hazardous Driving Travel Not Advised Closure No Report Available
Entire Metro Area Northwest Northeast Southwest Southeast
Congestion levels can be found by clicking the "Traffic" tab.
All Current Incidents
Accident\Incident - Interstate 494
Interstate 494 westbound: at Exit 9AB
crash

last updated today at 12:16 PM CDT
 
Roadwork - Interstate 35E
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue
bridge construction — until December 31, 2015
Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE

last updated May 24
 
Roadwork - Interstate 35W
Interstate 35W southbound: between I-94 and Exit 16A
bridge construction, bridge closed -- follow the detour signs — until August 16
Comment: For more information CLICK HERE No OSOW Restrictions

last updated May 3
 
Roadwork - Interstate 94
Interstate 94: at Wisconsin State Line
major road construction — until November 15
Comment: For WisDOT West Central Freeway Construction Updates: Click Here

last updated May 21
 
Roadwork - Interstate 494
Interstate 494: from Exit 1B 34th Avenue South to MN 100
major road construction — until September 30
Comment: Improvements to I-494 and replacement of the Xerxes Ave Bridge are underway. For more info and to sign up for email project updates CLICK HERE

last updated March 18
 
Roadwork - US 52
US 52 in both directions: at I-94, MN 803A
bridge construction — until September 15, 2014
Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed .

last updated May 9
 
Roadwork - US 61
US 61 in both directions: from after MN 55 to before US 10
bridge construction — until December 30
Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE

last updated November 30
 
Roadwork - MN 13
MN 13 in both directions: from Washburn Avenue to Nicollet Avenue
major road construction — until October 1
Comment: This is a Dakota County led project. For detailed information and to sign up for email updates: Click Here

last updated May 21
 
Alert - Interstate 35E
Interstate 35E southbound: from Exit 88A to Exit 88B Dakota County Road 42
road closed, bridge construction -- follow the detour signs — until Sunday, at about 5:00 PM CDT
Comment: For project and detour information and to sign up for email updates: Click Here

last updated May 29
 
Alert - Interstate 494
Interstate 494 in both directions: from Xerxes Overpass to MN 100
roadway reduced to one lane, night time construction work — until tomorrow at about 6:00 AM CDT
Comment: All lanes will re-open by 6a.m. daily through Friday, May 31 and by 8a.m. Saturday, June 1. For more information on this project: Click Here

last updated May 29
 
Alert - US 61
US 61 in both directions: from after MN 291 to before US 10
roadway reduced to one lane because of construction work — until today at about 4:00 PM CDT
Comment: From 8th Street to 14th Street, reduced to one lane in both directions; alternating lane closures; no restriction for OSOW vehicles.

last updated yesterday at 10:20 AM CDT
 
Alert - MN 55
MN 55 in both directions: from after Dakota County Road 42 - County Road 85 to US 61
roadway reduced to one lane because of construction work from 08:00am CDT to 04:00pm CDT on Thursday and Friday — until today at about 4:00 PM CDT
Comment: From Pine Street to US Highway 61, reduced to one lane in both directions; alternating lane closures; no restriction for OSOW vehicles.

last updated yesterday at 10:19 AM CDT

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

bridge construction on US 61 in both directions from after MN 55 to before US 10 — until December 30 last updated November 30 bridge construction on US 52 in both directions at I-94, MN 803A — until September 15, 2014 last updated May 9 major road construction on Interstate 494 from Exit 1B 34th Avenue South to MN 100 — until September 30 last updated March 18 bridge construction on Interstate 35E in both directions from Exit 107C University Avenue to Exit 109 Maryland Avenue — until December 31, 2015 last updated May 24 major road construction on MN 13 in both directions from Washburn Avenue to Nicollet Avenue — until October 1 last updated May 21 road closed, bridge construction on Interstate 35E southbound from Exit 88A to Exit 88B Dakota County Road 42 -- follow the detour signs — until Sunday, at about 5:00 PM CDT last updated May 29 roadway reduced to one lane, night time construction work on Interstate 494 in both directions from Xerxes Overpass to MN 100 — until tomorrow at about 6:00 AM CDT last updated May 29 roadway reduced to one lane on MN 55 in both directions from after Dakota County Road 42 - County Road 85 to US 61 because of construction work — until today at about 4:00 PM CDT last updated yesterday at 10:19 AM CDT roadway reduced to one lane on US 61 in both directions from after MN 291 to before US 10 because of construction work — until today at about 4:00 PM CDT last updated yesterday at 10:20 AM CDT major road construction on Interstate 94 at Wisconsin State Line — until November 15 last updated May 21 crash on Interstate 494 westbound at Exit 9AB last updated today at 12:16 PM CDT bridge construction, bridge closed on Interstate 35W southbound between I-94 and Exit 16A -- follow the detour signs — until August 16 last updated May 3 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints