Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  
 All Current Incidents   Text Only
 
Accident
Alert
Roadwork
Good Driving
Fair Driving
Difficult Driving
Hazardous Driving
Travel Not Advised
Closure
No Report Available

West Central Central East Central
Southwestern Southeastern
 
All Current Incidents
Roadwork - Interstate 94
Interstate 94 westbound: from Exit 201 Wright County Road 19 to before MN 241
road reconstruction Width limit 11 ' 0 " — until December 13
Comment: I94 - WB - thru Albertville between 241 & CR 19 - from 8:00 p.m. - 9:00 a.m. the City of Albertville is doing construction. Nothing over 11 ft. wide is permitted. For more information: Click Here

last updated April 23
 
Roadwork - US 10
US 10 in both directions: from Sherburne County Road 16 to before Sherburne County Road 50
construction traffic merging, major road construction Width limit 8 ' 6 " — until August 22
Comment: In Sherburne Co. on TH 10 - E. of TH 24 to W. of TH 25 - Big Lake. 2 way, 2 lane head to head traffic. No over width permits. Length of interference - 14 miles. For more information: Click Here

last updated March 30
 
Roadwork - US 14
US 14 in both directions: from after Nicollet County Road 17 to before US 169
road construction — until November 2
Comment: County Road 6 West of Hwy 14 is closed. The detour is to use Twp. 191, about 0.1 miles south of CR 6. CR 41 is closed south of Hwy 14, use Lookout Drive and follow detour.

last updated yesterday at 8:28 AM CDT
 
Roadwork - US 61
US 61 in both directions: from after MN 55 to before US 10
bridge construction — until December 31
Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE

last updated April 9
 
Roadwork - US 169
US 169 in both directions: from after US 14 to before MN 99
road maintenance operations, roadside cleanup crew at work, right lane closed -- maintenance vehicles — until Tuesday, at about 4:30 PM CDT
Comment: Ditch cleaning is in progress. Watch for workers and equipment in work zone. No restrictions for OSOW vehicles.

last updated May 24
 
Roadwork - MN 15
MN 15 in both directions: from after Watonwan County Road 58 to before MN 68
road maintenance operations, single line traffic - alternating directions — until June 3
Comment: Patching operations in progress. One lane open. Watch for flagging operation. No restrictions for OSOW vehicles.

last updated May 3
 
Roadwork - MN 23
MN 23: from after South Junction with County Road 66 to before North Junction with County Road 123
road reconstruction Width limit 11 ' 0 " — until June 15
Comment: Lane shift onto temporary bypass. Reduce speed and narrow lane widths.

last updated May 9
 
Roadwork - MN 24
MN 24 in both directions: from I-94 to US 10
paving operations, single line traffic - alternating directions Width limit 12 ' 6 " from 10:00am CDT to 06:00pm CDT daily — until July 10
Comment: Paving 4-lane roadways, traffic will shift to 1-lane thru the work zone and be directed by flaggers. Pilot cars will be utilized on 2-lane roadways. Road surfacing/intermittent lane closures. Please visit: Click Here

last updated May 18
 
Roadwork - MN 25
MN 25 in both directions: from Wright County Road 138 to Wright County Road 106
paving operations, single line traffic - alternating directions, night time construction work from 10:00am CDT to 06:00pm CDT daily — until July 10
Comment: Surfacing work - paving 4-lane roadways, traffic will shift to 1-lane thru the work zone and be directed by flaggers. Pilot cars will be utilized on 2-lane roadways. Visit: Click Here

last updated May 18
 
Roadwork - MN 60
MN 60 in both directions: from after MN 15 to before Blue Earth County Road 6
single line traffic - alternating directions, road maintenance operations — until June 22
Comment: Patching operation in progress. Alternating East and westbound lanes. Moving operation. Watch for crash trucks/signage. No restrictions for OSOW vehicles.

last updated May 22
 
Roadwork - MN 60
MN 60 in both directions: from Blue Earth County Road 20 to before Blue Earth County Road 114
road maintenance operations, roadway reduced to one lane due to single line traffic - alternating directions Width limit 12 ' 0 " — until June 29
Comment: Resurfacing, guardrail repair and work on bridge approaches near Lake Crystal and Lily Lake. Drive careful and watch out for workers.

last updated April 25
 
Alert - US 8
US 8: from after Chisago County Road 77 to before Chisago County Road 32
delays due to road construction work Width limit 11 ' 0 " — until December 1
Comment: OSOW Restrictions - 11' wide lanes. Work Zone area is from Shoquist Ln to Irene Ave. in Lindstrom.

last updated May 24
 
Alert - US 14
US 14 in both directions: from Dodge County Road 9 to Olmsted County Road 5
roadway reduced to one lane, width limit in effect because of road maintenance activities Width limit 10 ' 0 " — until July 9

last updated May 15
 
Alert - MN 4
MN 4: from MN 30 to before Brown County Road 22
bridge closed, detour in operation, bridge construction Width limit 10 ' 0 " — until July 31
Comment: Detour: From CR 4 head West on TH 30, North on CR 18, North on CR 9, East on CR 18. Bridge replacement near Godahl. DETOURED- follow signs.

last updated May 7
 
Alert - MN 5
MN 5: from after Carver County Road 10 to before MN 284
road closed to traffic, road construction, detour in operation, width limit in effect Width limit 11 ' 5 " — until June 28
Comment: Follow Detour at 78th Street. Restriction of 11.5 feet wide.

last updated May 15
 
Alert - MN 21
MN 21: from MN 60 to I-35
lane closed because of major road construction work and because permitted oversize loads are prohibited — until June 29

last updated May 14
 
Alert - MN 30
MN 30 in both directions: from MN 15 to US 169
road closed, detour in operation, road construction — until June 30
Comment: Detour: South on TH 15, East on CR 52, East on CR 14, North on US 169. No over dimensional permits requested

last updated May 2

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
bridge closed, detour in operation, bridge construction on MN 4 from MN 30 to before Brown County Road 22 — until July 31 last updated May 7 road closed, detour in operation, road construction on MN 30 in both directions from MN 15 to US 169 — until June 30 last updated May 2 bridge construction on US 61 in both directions from after MN 55 to before US 10 — until December 31 last updated April 9 road closed to traffic, road construction, detour in operation, width limit in effect on MN 5 from after Carver County Road 10 to before MN 284 — until June 28 last updated May 15 roadway reduced to one lane, width limit in effect on US 14 in both directions from Dodge County Road 9 to Olmsted County Road 5 because of road maintenance activities — until July 9 last updated May 15 single line traffic - alternating directions, road maintenance operations on MN 60 in both directions from after MN 15 to before Blue Earth County Road 6 — until June 22 last updated May 22 delays on US 8 from after Chisago County Road 77 to before Chisago County Road 32 due to road construction work — until December 1 last updated May 24 road reconstruction on Interstate 94 westbound from Exit 201 Wright County Road 19 to before MN 241 — until December 13 last updated April 23 road maintenance operations, roadway reduced to one lane on MN 60 in both directions from Blue Earth County Road 20 to before Blue Earth County Road 114 due to single line traffic - alternating directions — until June 29 last updated April 25 road construction on US 14 in both directions from after Nicollet County Road 17 to before US 169 — until November 2 last updated yesterday at 8:28 AM CDT road maintenance operations, single line traffic - alternating directions on MN 15 in both directions from after Watonwan County Road 58 to before MN 68 — until June 3 last updated May 3 paving operations, single line traffic - alternating directions on MN 24 in both directions from I-94 to US 10 — until July 10 last updated May 18 paving operations, single line traffic - alternating directions, night time construction work on MN 25 in both directions from Wright County Road 138 to Wright County Road 106 — until July 10 last updated May 18 road reconstruction on MN 23 from after South Junction with County Road 66 to before North Junction with County Road 123 — until June 15 last updated May 9 lane closed on MN 21 from MN 60 to I-35 because of major road construction work and because permitted oversize loads are prohibited — until June 29 last updated May 14 road maintenance operations, roadside cleanup crew at work, right lane closed on US 169 in both directions from after US 14 to before MN 99 -- maintenance vehicles — until Tuesday, at about 4:30 PM CDT last updated May 24 construction traffic merging, major road construction on US 10 in both directions from Sherburne County Road 16 to before Sherburne County Road 50 — until August 22 last updated March 30
Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints