| All Current Incidents |
| Roadwork - Interstate 94 |
Interstate 94 westbound: from Exit 201 Wright County Road 19 to before MN 241 road reconstruction Width limit 11 ' 0 " — until December 13 Comment: I94 - WB - thru Albertville between 241 & CR 19 - from 8:00 p.m. - 9:00 a.m. the City of Albertville is doing construction. Nothing over 11 ft. wide is permitted. For more information: Click Here last updated April 23 |
| |
| Roadwork - US 10 |
US 10 in both directions: from Sherburne County Road 16 to before Sherburne County Road 50 construction traffic merging, major road construction Width limit 8 ' 6 " — until August 22 Comment: In Sherburne Co. on TH 10 - E. of TH 24 to W. of TH 25 - Big Lake. 2 way, 2 lane head to head traffic. No over width permits. Length of interference - 14 miles. For more information: Click Here last updated March 30 |
| |
| Roadwork - US 14 |
US 14 in both directions: from after Nicollet County Road 17 to before US 169 road construction — until November 2 Comment: County Road 6 West of Hwy 14 is closed. The detour is to use Twp. 191, about 0.1 miles south of CR 6. CR 41 is closed south of Hwy 14, use Lookout Drive and follow detour. last updated yesterday at 8:28 AM CDT |
| |
| Roadwork - US 61 |
US 61 in both directions: from after MN 55 to before US 10 bridge construction — until December 31 Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE last updated April 9 |
| |
| Roadwork - US 169 |
US 169 in both directions: from after US 14 to before MN 99 road maintenance operations, roadside cleanup crew at work, right lane closed -- maintenance vehicles — until Tuesday, at about 4:30 PM CDT Comment: Ditch cleaning is in progress. Watch for workers and equipment in work zone. No restrictions for OSOW vehicles. last updated May 24 |
| |
| Roadwork - MN 15 |
MN 15 in both directions: from after Watonwan County Road 58 to before MN 68 road maintenance operations, single line traffic - alternating directions — until June 3 Comment: Patching operations in progress. One lane open. Watch for flagging operation. No restrictions for OSOW vehicles. last updated May 3 |
| |
| Roadwork - MN 23 |
MN 23: from after South Junction with County Road 66 to before North Junction with County Road 123 road reconstruction Width limit 11 ' 0 " — until June 15 Comment: Lane shift onto temporary bypass. Reduce speed and narrow lane widths. last updated May 9 |
| |
| Roadwork - MN 24 |
MN 24 in both directions: from I-94 to US 10 paving operations, single line traffic - alternating directions Width limit 12 ' 6 " from 10:00am CDT to 06:00pm CDT daily — until July 10 Comment: Paving 4-lane roadways, traffic will shift to 1-lane thru the work zone and be directed by flaggers. Pilot cars will be utilized on 2-lane roadways. Road surfacing/intermittent lane closures. Please visit: Click Here last updated May 18 |
| |
| Roadwork - MN 25 |
MN 25 in both directions: from Wright County Road 138 to Wright County Road 106 paving operations, single line traffic - alternating directions, night time construction work from 10:00am CDT to 06:00pm CDT daily — until July 10 Comment: Surfacing work - paving 4-lane roadways, traffic will shift to 1-lane thru the work zone and be directed by flaggers. Pilot cars will be utilized on 2-lane roadways. Visit: Click Here last updated May 18 |
| |
| Roadwork - MN 60 |
MN 60 in both directions: from after MN 15 to before Blue Earth County Road 6 single line traffic - alternating directions, road maintenance operations — until June 22 Comment: Patching operation in progress. Alternating East and westbound lanes. Moving operation. Watch for crash trucks/signage. No restrictions for OSOW vehicles. last updated May 22 |
| |
| Roadwork - MN 60 |
MN 60 in both directions: from Blue Earth County Road 20 to before Blue Earth County Road 114 road maintenance operations, roadway reduced to one lane due to single line traffic - alternating directions Width limit 12 ' 0 " — until June 29 Comment: Resurfacing, guardrail repair and work on bridge approaches near Lake Crystal and Lily Lake. Drive careful and watch out for workers. last updated April 25 |
| |
| Alert - US 8 |
US 8: from after Chisago County Road 77 to before Chisago County Road 32 delays due to road construction work Width limit 11 ' 0 " — until December 1 Comment: OSOW Restrictions - 11' wide lanes. Work Zone area is from Shoquist Ln to Irene Ave. in Lindstrom. last updated May 24 |
| |
| Alert - US 14 |
US 14 in both directions: from Dodge County Road 9 to Olmsted County Road 5 roadway reduced to one lane, width limit in effect because of road maintenance activities Width limit 10 ' 0 " — until July 9 last updated May 15 |
| |
| Alert - MN 4 |
MN 4: from MN 30 to before Brown County Road 22 bridge closed, detour in operation, bridge construction Width limit 10 ' 0 " — until July 31 Comment: Detour: From CR 4 head West on TH 30, North on CR 18, North on CR 9, East on CR 18. Bridge replacement near Godahl. DETOURED- follow signs. last updated May 7 |
| |
| Alert - MN 5 |
MN 5: from after Carver County Road 10 to before MN 284 road closed to traffic, road construction, detour in operation, width limit in effect Width limit 11 ' 5 " — until June 28 Comment: Follow Detour at 78th Street. Restriction of 11.5 feet wide. last updated May 15 |
| |
| Alert - MN 21 |
MN 21: from MN 60 to I-35 lane closed because of major road construction work and because permitted oversize loads are prohibited — until June 29 last updated May 14 |
| |
| Alert - MN 30 |
MN 30 in both directions: from MN 15 to US 169 road closed, detour in operation, road construction — until June 30 Comment: Detour: South on TH 15, East on CR 52, East on CR 14, North on US 169. No over dimensional permits requested last updated May 2 |