| All Current Incidents |
| Accident\Incident - Interstate 94 |
Interstate 94 westbound: between I-35W and Exit 234A Hiawatha Avenue crash last updated today at 10:16 AM CDT |
| |
| Roadwork - Interstate 35E |
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue bridge construction — until December 31, 2015 Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE last updated May 24 |
| |
| Roadwork - Interstate 35W |
Interstate 35W southbound: between I-94 and Exit 16A bridge construction, bridge closed -- follow the detour signs — until August 16 Comment: For more information CLICK HERE No OSOW Restrictions last updated May 3 |
| |
| Roadwork - Interstate 94 |
Interstate 94: at Wisconsin State Line major road construction — until November 15 Comment: For WisDOT West Central Freeway Construction Updates: Click Here last updated May 21 |
| |
| Roadwork - Interstate 494 |
Interstate 494: from Exit 1B 34th Avenue South to MN 100 major road construction — until September 30 Comment: Improvements to I-494 and replacement of the Xerxes Ave Bridge are underway. For more info and to sign up for email project updates CLICK HERE last updated March 18 |
| |
| Roadwork - Interstate 694 |
Interstate 694 in both directions: from I-35W to Exit 104C Victoria Street long term road construction Width limit 10 ' 0 " — until November 15 Comment: Will be ramp closures and non-peak lane closures. For more info CLICK HERE last updated April 12 |
| |
| Roadwork - US 52 |
US 52 in both directions: at I-94, MN 803A bridge construction — until September 15, 2014 Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed . last updated May 9 |
| |
| Roadwork - US 61 |
US 61 in both directions: from after MN 55 to before US 10 bridge construction — until December 30 Comment: A new Hastings Bridge is being built across the Mississippi River. For more info and to sign up for weekly e-mail project updates CLICK HERE last updated November 30 |
| |
| Roadwork - MN 13 |
MN 13 in both directions: from Washburn Avenue to Nicollet Avenue major road construction — until October 1 Comment: This is a Dakota County led project. For detailed information and to sign up for email updates: Click Here last updated May 21 |
| |
| Roadwork - MN 100 |
MN 100 in both directions: between Exit 14B 57th Avenue North and I-94 bridge construction, bridge closed — until August 16 Comment: Bridge closed. For more detailed information Click Here last updated April 29 |
| |
| Alert - Interstate 35E |
Interstate 35E southbound: from Exit 88A to Exit 88B Dakota County Road 42 road closed, bridge construction -- follow the detour signs — until Sunday, at about 5:00 PM CDT Comment: For project and detour information and to sign up for email updates: Click Here last updated May 29 |
| |
| Alert - Interstate 35E |
Interstate 35E in both directions: from Exit 117 to Exit 120 Ramsey County Road J roadway reduced to one lane because people are working in the median from 05:00am CDT to 07:00pm CDT on Tuesday, Wednesday, Thursday and Friday — for two days Comment: NB I-35E between 5:00a-2:00p, SB I-35E between 11:00a-7:00p, Friday work on NB will end at 1:00 pm, No restrictions for OSOW vehicles. last updated May 29 |
| |
| Alert - Interstate 494 |
Interstate 494 in both directions: from Xerxes Overpass to MN 100 roadway reduced to one lane, night time construction work — until tomorrow at about 6:00 AM CDT Comment: All lanes will re-open by 6a.m. daily through Friday, May 31 and by 8a.m. Saturday, June 1. For more information on this project: Click Here last updated May 29 |
| |
| Alert - US 61 |
US 61 in both directions: from after MN 291 to before US 10 roadway reduced to one lane because of construction work — until today at about 4:00 PM CDT Comment: From 8th Street to 14th Street, reduced to one lane in both directions; alternating lane closures; no restriction for OSOW vehicles. last updated yesterday at 10:20 AM CDT |
| |
| Alert - US 169 |
US 169 southbound: from after Scott County Road 69 to before MN 801B right shoulder closed, bridge maintenance operations — until today at about 2:00 PM CDT Comment: Repair bridge railing last updated yesterday at 10:46 AM CDT |
| |
| Alert - US 169 |
US 169 in both directions: from Anderson Lakes Parkway to Exit 123 Valley View Road roadway reduced to one lane, road construction — until tomorrow at about 5:00 AM CDT Comment: No OSOW Restrictions last updated yesterday at 9:41 AM CDT |
| |
| Alert - US 169 |
US 169 southbound: from Exit 138 77th Avenue North to 101st Avenue roadway reduced to one lane, night time construction work because of construction work — until tomorrow at about 5:00 AM CDT Comment: No OSOW Permit Restrictions last updated today at 9:04 AM CDT |
| |
| Alert - MN 55 |
MN 55 in both directions: from after Dakota County Road 42 - County Road 85 to US 61 roadway reduced to one lane because of construction work from 08:00am CDT to 04:00pm CDT on Thursday and Friday — until today at about 4:00 PM CDT Comment: From Pine Street to US Highway 61, reduced to one lane in both directions; alternating lane closures; no restriction for OSOW vehicles. last updated yesterday at 10:19 AM CDT |
| |
| Alert - MN 101 |
MN 101 in both directions: from after Hennepin County Road 14 to before MN 901B road closed, road reconstruction — until November 15 Comment: No OSOW restrictions. This is a City of Chanhassen led project. For more information and to sign up for email project updates: Click Here last updated April 25 |