Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  Cameras  Traffic  
 All Current Incidents   Text Only
Accident Alert Roadwork Good Driving Fair Driving Difficult Driving Hazardous Driving Travel Not Advised Closure No Report Available
Entire Metro Area Northwest Northeast Southwest Southeast
Congestion levels can be found by clicking the "Traffic" tab.
All Current Incidents
Accident\Incident - Interstate 35E
Interstate 35E northbound: between Exit 110B Roselawn Avenue and MN 36
crash

last updated today at 3:46 PM CDT
 
Accident\Incident - MN 36
MN 36 westbound: at Exit 5AB
crash

last updated today at 3:46 PM CDT
 
Accident\Incident - MN 36
MN 36 westbound: at Exit 5AB
crash

last updated today at 3:46 PM CDT
 
Roadwork - Interstate 35E
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue
bridge construction — until December 31, 2015
Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE

last updated May 24
 
Roadwork - Interstate 35W
Interstate 35W southbound: between I-94 and Exit 16A
bridge construction, bridge closed -- follow the detour signs — until August 16
Comment: For more information CLICK HERE No OSOW Restrictions

last updated May 3
 
Roadwork - Interstate 94
Interstate 94: at Wisconsin State Line
major road construction — until November 15
Comment: For WisDOT West Central Freeway Construction Updates: Click Here

last updated May 21
 
Roadwork - Interstate 694
Interstate 694 in both directions: from I-35W to Exit 104C Victoria Street
long term road construction Width limit 10 ' 0 " — until November 15
Comment: Will be ramp closures and non-peak lane closures. For more info CLICK HERE

last updated April 12
 
Roadwork - US 8
US 8: from after Chisago County Road 77 to before Chisago County Road 32
construction work — until today at about 5:00 PM CDT
Comment: For more information on this project:Click Here

last updated January 28
 
Roadwork - US 52
US 52 in both directions: at I-94, MN 803A
bridge construction — until September 15, 2014
Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed .

last updated May 9
 
Roadwork - MN 100
MN 100 in both directions: between Exit 14B 57th Avenue North and I-94
bridge construction, bridge closed — until August 16
Comment: Bridge closed. For more detailed information Click Here

last updated April 29
 
Alert - Interstate 94
Interstate 94 in both directions: from MN 252 to I-394
right lane closed — until Friday, at about 5:30 PM CDT
Comment: on & off ramps will be closed as needed

last updated May 31
 
Alert - US 952A
US 952A in both directions: from MN 110, MN 3 to MN 5
roadway reduced to one lane, center lane closed, road construction — until June 11
Comment: Single lane traffic between Logan Ave. and Wentworth Ave. for installation of a water main.

last updated May 30

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

long term road construction on Interstate 694 in both directions from I-35W to Exit 104C Victoria Street — until November 15 last updated April 12 bridge construction on US 52 in both directions at I-94, MN 803A — until September 15, 2014 last updated May 9 bridge construction on Interstate 35E in both directions from Exit 107C University Avenue to Exit 109 Maryland Avenue — until December 31, 2015 last updated May 24 roadway reduced to one lane, center lane closed, road construction on US 952A in both directions from MN 110, MN 3 to MN 5 — until June 11 last updated May 30 bridge construction, bridge closed on MN 100 in both directions between Exit 14B 57th Avenue North and I-94 — until August 16 last updated April 29 major road construction on Interstate 94 at Wisconsin State Line — until November 15 last updated May 21 crash on MN 36 westbound at Exit 5AB last updated today at 3:46 PM CDT crash on MN 36 westbound at Exit 5AB last updated today at 3:46 PM CDT crash on Interstate 35E northbound between Exit 110B Roselawn Avenue and MN 36 last updated today at 3:46 PM CDT construction work on US 8 from after Chisago County Road 77 to before Chisago County Road 32 — until today at about 5:00 PM CDT last updated January 28 right lane closed on Interstate 94 in both directions from MN 252 to I-394 — until Friday, at about 5:30 PM CDT last updated May 31 bridge construction, bridge closed on Interstate 35W southbound between I-94 and Exit 16A -- follow the detour signs — until August 16 last updated May 3 Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints