| All Current Incidents |
| Accident\Incident - Interstate 35E |
Interstate 35E northbound: between Exit 110B Roselawn Avenue and MN 36 crash last updated today at 3:46 PM CDT |
| |
| Accident\Incident - MN 36 |
MN 36 westbound: at Exit 5AB crash last updated today at 3:46 PM CDT |
| |
| Accident\Incident - MN 36 |
MN 36 westbound: at Exit 5AB crash last updated today at 3:46 PM CDT |
| |
| Roadwork - Interstate 35E |
Interstate 35E in both directions: from Exit 107C University Avenue to Exit 109 Maryland Avenue bridge construction — until December 31, 2015 Comment: The Cayuga Project includes multiple construction sites. For more information and to sign up for email alerts CLICK HERE last updated May 24 |
| |
| Roadwork - Interstate 35W |
Interstate 35W southbound: between I-94 and Exit 16A bridge construction, bridge closed -- follow the detour signs — until August 16 Comment: For more information CLICK HERE No OSOW Restrictions last updated May 3 |
| |
| Roadwork - Interstate 94 |
Interstate 94: at Wisconsin State Line major road construction — until November 15 Comment: For WisDOT West Central Freeway Construction Updates: Click Here last updated May 21 |
| |
| Roadwork - Interstate 694 |
Interstate 694 in both directions: from I-35W to Exit 104C Victoria Street long term road construction Width limit 10 ' 0 " — until November 15 Comment: Will be ramp closures and non-peak lane closures. For more info CLICK HERE last updated April 12 |
| |
| Roadwork - US 8 |
US 8: from after Chisago County Road 77 to before Chisago County Road 32 construction work — until today at about 5:00 PM CDT Comment: For more information on this project:Click Here last updated January 28 |
| |
| Roadwork - US 52 |
US 52 in both directions: at I-94, MN 803A bridge construction — until September 15, 2014 Comment: The Lafayette Bridge is being replaced. For more information Click Here NOTE: No vehicle or vehicle combinations over 35 ft. in length are allowed to use the Lafayette Bridge north of Plato Blvd until the crossover is removed . last updated May 9 |
| |
| Roadwork - MN 100 |
MN 100 in both directions: between Exit 14B 57th Avenue North and I-94 bridge construction, bridge closed — until August 16 Comment: Bridge closed. For more detailed information Click Here last updated April 29 |
| |
| Alert - Interstate 94 |
Interstate 94 in both directions: from MN 252 to I-394 right lane closed — until Friday, at about 5:30 PM CDT Comment: on & off ramps will be closed as needed last updated May 31 |
| |
| Alert - US 952A |
US 952A in both directions: from MN 110, MN 3 to MN 5 roadway reduced to one lane, center lane closed, road construction — until June 11 Comment: Single lane traffic between Logan Ave. and Wentworth Ave. for installation of a water main. last updated May 30 |