Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 Roadwork & Maintenance Activities By Month.   Text Only
 
Roadwork

North Central
West Central Central
 
Roadwork & Maintenance Activities By Month.
Roadwork - US 2
US 2: from before North Dakota Line to before Polk County Road 17
roadway reduced to two lanes, paving operations, width limit in effect, delays Width limit 11 ' 0 " — starting 6:00 AM, 06/02/13 until July 27
Comment: 11 foot width restriction. From ND border to 2 miles west.

last updated May 21
 
Roadwork - US 2
US 2 eastbound: from MN 220 to MN 220
roadway reduced to two lanes, narrow lanes, width limit in effect, paving operations, delays -- a mandatory speed limit is in force Width limit 11 ' 0 " — starting 6:00 AM, 06/02/13 until July 27
Comment: This is from the intersection of US 2 and MN 220 in EGF to the technical college. 11 foot width restriction.

last updated May 21
 
Roadwork - US 2
US 2: from Polk County Road 11 to Polk County Road 9
roadway reduced to two lanes, paving operations, width limit in effect, delays -- reduce your speed, consider using an alternate route Width limit 11 ' 0 " — starting 6:00 AM, 06/02/13 until July 27
Comment: 11 foot width restriction. Public encouraged to take alternate routes around Crookston. This is from the east end of Crookston to the west end. Polk county road 9 to US 75 by-pass will by-pass this project.

last updated May 21
 
Roadwork - US 59
US 59: from after Pennington County Road 125 to before Pennington County Road 57B
bridge closed, detour in operation, bridge construction — starting 6:00 AM, 06/17/13 until August 30
Comment: No Oversize or overweight vehicles allowed on Pennington County Road 3. Detour route is MN 92 west of Brooks, MN 32 from MN 92 to St. Hilaire, and Pennington County Road 3 from MN 32 to US 59.

last updated May 28
 
Roadwork - MN 1
MN 1: from after MN 89 to before Township Road 404
bridge demolition work, detour in operation — until August 24
Comment: Road closed and detour to begin June 3-Aug 24, Hwy 1 Eastbound traffic to Beltrami Co Rd #23 S to Beltrami County #32 E to TH 72 North to Hwy 1 at busy corner. No OSOW travel on detour.

last updated May 23
 
Roadwork - MN 89
MN 89 in both directions: from after Roseau County Road 122 to before Roseau County Road 131
bridge closed, bridge construction, detour in operation, overloads are not permitted — starting 6:00 AM, 06/17/13 until August 30
Comment: This is located 4.6 miles south of Wannaska over the South Fork Roseau River. 9 ton weight restriction on detour roads. Detour route is Roseau County 4, Roseau County 9, Marshall County 54/Beltrami CSAH1 and Marshall County 6.

last updated today at 9:46 AM CDT
 
Roadwork - MN 200
MN 200: from North Dakota State Line to US 75
detour in operation, paving operations, width limit in effect — starting 6:00 AM, 06/02/13 until July 27
Comment: This project is by Halstad. Traffic will be detoured on Norman County 147. 11 foot width restriction on detour. Expect delays.

last updated May 21
 
Roadwork - MN 200
MN 200: from after MN 64 to before Hubbard County Road 39
road closed to traffic, road maintenance operations, detour in operation, axle load limit in effect, width limit in effect — until August 19
Comment: Grading, bituminous surfacing. Road closure and detour to begin 5/28 - 8/19. See detour route on map....follow signage for detour. Reduce speed on two lane county roads. No over width travel on detour. Weight restricted to 10 ton axle loads.

last updated May 23
 
Roadwork - MN 371
MN 371: from after Sautbine RD NW to before MN 200
bridge maintenance operations -- reduce your speed — until July 15
Comment: Speed limit 45 mph. 11' lane widths. For over legal width and length contact Dave Enblom 218-547-1211. For over legal weight call Jim Bittman 218-755-6543.

last updated May 23

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About MnDOT | Disclaimer and legal | Doing Business | Contact MnDOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed to traffic, road maintenance operations, detour in operation, axle load limit in effect, width limit in effect on MN 200 from after MN 64 to before Hubbard County Road 39 — until August 19 last updated May 23
bridge closed, detour in operation, bridge construction on US 59 from after Pennington County Road 125 to before Pennington County Road 57B — starting 6:00 AM, 06/17/13 until August 30 last updated May 28
bridge closed, bridge construction, detour in operation, overloads are not permitted on MN 89 in both directions from after Roseau County Road 122 to before Roseau County Road 131 — starting 6:00 AM, 06/17/13 until August 30 last updated today at 9:46 AM CDT
roadway reduced to two lanes, paving operations, width limit in effect, delays on US 2 from before North Dakota Line to before Polk County Road 17 — starting 6:00 AM, 06/02/13 until July 27 last updated May 21
roadway reduced to two lanes, paving operations, width limit in effect, delays on US 2 from Polk County Road 11 to Polk County Road 9 -- reduce your speed, consider using an alternate route — starting 6:00 AM, 06/02/13 until July 27 last updated May 21
bridge demolition work, detour in operation on MN 1 from after MN 89 to before Township Road 404 — until August 24 last updated May 23
roadway reduced to two lanes, narrow lanes, width limit in effect, paving operations, delays on US 2 eastbound from MN 220 to MN 220 -- a mandatory speed limit is in force — starting 6:00 AM, 06/02/13 until July 27 last updated May 21
bridge maintenance operations on MN 371 from after Sautbine RD NW to before MN 200 -- reduce your speed — until July 15 last updated May 23
detour in operation, paving operations, width limit in effect on MN 200 from North Dakota State Line to US 75 — starting 6:00 AM, 06/02/13 until July 27 last updated May 21
Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints