Home | Getting Around | 511 Traveler Info |
Mn/DOT A to Z | Contact | Search |
Traffic and Road Conditions
Weather Reports, Construction, Delays, Detours, and more.
511 User Guide
Traffic Cams
Public Transit
 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 Roadwork & Maintenance Activities By Month.   Text Only
 
Roadwork

West Central Central
South Central
 
Roadwork & Maintenance Activities By Month.
Roadwork - Interstate 90
Interstate 90 in both directions: from after MN 4 to before Exit 128
road maintenance operations -- trucks are entering the roadway — starting 7:00 AM, 09/08/10 until October 5
Comment: Crews working in ditch or shoulder area to repair culverts on I-90 from near Sherburn to Jct of Hwy 254 . Watch for equipment moving.

last updated August 6
 
Roadwork - US 59
US 59: from after Yellow Medicine County Road 3 to before MN 67
road construction -- detour in operation, follow the detour signs — until September 30
Comment: Shoulder widening and culvert lining.

last updated August 26
 
Roadwork - US 71
US 71 in both directions: from Cottonwood County Road 25 to before MN 60
road closed, bridge construction, width limit in effect -- detour in operation, follow the signs Width limit 12 ' 0 " — until October 15
Comment: Bridge Replacement Windom TH 71 South: Outhbound detour from TH 71 onto Cottonwood County 17, south to Jackson County 30, east to rejoin TH 71.

last updated July 28
 
Roadwork - MN 23
MN 23: from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33
road construction -- detour in operation, follow the detour signs Vehicle length limit 75.0 ft, Height limit 13 ' 6 ", Width limit 8 ' 6 ", No vehicles over 80000 lbs — until October 31
Comment: Construct four-lane segments, pedestrian underpass, surfacing, lighting and signals.

last updated August 26
 
Roadwork - MN 60
MN 60: from Nobles County Road 4 to before US 59
new road layout -- trucks are entering the roadway — until November 6
Comment: Milemarker 2-9. New road construction near old involving heavy equipment.

last updated April 6
 
Roadwork - MN 60
MN 60 eastbound: from I-90 to Jackson County Road 13
road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits Width limit 8 ' 6 " — until October 10
Comment: SP 3204-64 Bituminous Mill and Overlay TH 60 EBL Worthington to Wilder. 2-way traffic on west bound lanes from Worthington to Heron Lake. Over-width & Over-length loads not permitted.

last updated August 19
 
Roadwork - MN 68
MN 68: from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B
road construction -- detour in operation, follow the detour signs Width limit 11 ' 0 ", Axle weight limit 20000 lbs — until October 8
Comment: Type of work: mill and overlay, sanitary and storm sewer

last updated August 26

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

road closed, bridge construction, width limit in effect on US 71 in both directions from Cottonwood County Road 25 to before MN 60 -- detour in operation, follow the signs — until October 15 last updated July 28
road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits on MN 60 eastbound from I-90 to Jackson County Road 13 — until October 10 last updated August 19
road construction on US 59 from after Yellow Medicine County Road 3 to before MN 67 -- detour in operation, follow the detour signs — until September 30 last updated August 26
road maintenance operations on Interstate 90 in both directions from after MN 4 to before Exit 128 -- trucks are entering the roadway — starting 7:00 AM, 09/08/10 until October 5 last updated August 6
road construction on MN 68 from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B -- detour in operation, follow the detour signs — until October 8 last updated August 26
road construction on MN 23 from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33 -- detour in operation, follow the detour signs — until October 31 last updated August 26
new road layout on MN 60 from Nobles County Road 4 to before US 59 -- trucks are entering the roadway — until November 6 last updated April 6
Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints