 Critical Incidents  Road Conditions  Roadwork  All  Weather  Commercial Vehicles  
 Roadwork & Maintenance Activities By Month.   Text Only
 
Roadwork

For Minneapolis/St. Paul information, click on the map or select Minneapolis/St. Paul.
Roadwork & Maintenance Activities By Month.
Roadwork - Interstate 35
Interstate 35 in both directions: from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street
roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits -- consider using an alternate route — until September 14
Comment: Northbound and southbound traffic will be head-to-head on southbound lanes. Expect major delays during peak weekend travel times, including Friday and Sunday evenings. During backups use both lanes, take turns at merge.

last updated July 27
 
Roadwork - Interstate 35
Interstate 35 in both directions: between MN 19 and Exit 76 Deuce Road
bridge closed, bridge maintenance operations — starting 5:00 AM, 09/07/10 for the next month
Comment: The bridge over I-35 is closed. Detour: From eastbound Rice CR 86, go north on Scott CR 91, east on Scott CR 2, south on Scott CR 46 and back to Rice CR 86. Work is expected to be completed by the end of September, weather permitting.

last updated August 30
 
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction — until November 1
Comment: Removing and replacing the Hwy 95 bridge spanning I 35. For more information CLICK HERE

last updated June 24
 
Roadwork - Interstate 35
Interstate 35: at MN 95
bridge construction, roadway reduced to one lane from 09:00am CDT to 03:00pm CDT on weekdays
Comment: Bridge work on substructures.

last updated June 29
 
Roadwork - Interstate 35
Interstate 35: from Exit 175 Pine County Road 14 to North Junction with County Road 61
exit ramp closed, road construction -- detour in operation Width limit 12 ' 0 " — until September 8
Comment: I-35 SB off ramp to TH 23 is closed, southbound traffic will be detoured at Hinckley on Pine County 48 and Pine County 61. TH 23 sand I-35 bridge on and off ramps are open.

last updated yesterday at 1:43 PM CDT
 
Roadwork - Interstate 35
Interstate 35 in both directions: from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4
roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until September 15
Comment: On I-35 from Mahtowa to Sturgeon Lake temporary single lane closures during the week days. Weekends both northbound and southbound traffic will be fully restored to all lanes. The Culkin Rest area on I-35 will be closed for a total of 7 consecutive days starting on Tuesday, September 7th, 2010. The Saginaw truck scale at TH 2 and TH 33 will be closed for a total of 5 days starting Monday, September 13th.

last updated yesterday at 1:34 PM CDT
 
Roadwork - Interstate 35
Interstate 35 southbound: from MN 45 to Exit 242 Carlton County Road 1
road construction, width limit in effect, right lane closed Width limit 12 ' 0 " — starting 6:00 AM, 09/07/10 until October 15
Comment: Southbound I-35 traffic will be reduced to one lane on the right shoulder during shoulder reconstruction.

last updated yesterday at 1:52 PM CDT
 
Roadwork - Interstate 35
Interstate 35: from Exit 249 Boundary Avenue to Exit 256A Mesaba Avenue
major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane -- trucks are recommended to avoid the area, drive with extreme caution Width limit 11 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: In Duluth from Boundary Avenue to 21st Avenue East, all traffic will be switched onto the NB lanes of I-35. Motorists are urged to proceed with caution due to construction activities and ramp closures. For more information CLICK HERE

last updated yesterday at 1:30 PM CDT
 
Roadwork - Interstate 35
Interstate 35 southbound: from Exit 252 Central Avenue to US 2
entrance ramp closed, major road construction — until October 30
Comment: Central Avenue ramp to SB I-35 is closed, detour to Cody St. to SB I-35.

last updated July 27
 
Roadwork - Interstate 35
Interstate 35: at I-535, US 53
exit ramp closed, major road construction — until October 30
Comment: On I-35 NB ramp to NB Hwy 53 - is closed, detour to 5th Avenue W & loop back. NB I-35 ramp to SB TH 535 to Superior is closed, detour to Hwy 2 or 27th Avenue W to Michigan St. to 21st Avenue W to I-535.

last updated July 27
 
Roadwork - Interstate 90
Interstate 90 in both directions: from after MN 4 to before Exit 128
road maintenance operations -- trucks are entering the roadway — starting 7:00 AM, 09/08/10 until October 5
Comment: Crews working in ditch or shoulder area to repair culverts on I-90 from near Sherburn to Jct of Hwy 254 . Watch for equipment moving.

last updated August 6
 
Roadwork - Interstate 90
Interstate 90: from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast
roadway reduced to one lane, major road construction, width limit in effect, length limit in effect Vehicle length limit 75.0 ft, Width limit 11 ' 0 " — until October 15
Comment: Daytime lane closures and traffic bypasses. For more information on this project CLICK HERE

last updated April 16
 
Roadwork - Interstate 90
Interstate 90 westbound: from after MN 56 to MN 16
road construction, roadway reduced to one lane, width limit in effect Width limit 10 ' 0 " — until September 15
Comment: Concrete Pavement Rehabilitation, Grinding and Biruminous Should Replacement

last updated July 9
 
Roadwork - Interstate 94
Interstate 94 in both directions: from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75
road construction, bridge construction, delays — until December 15
Comment: I94 - MP 193- MP 195 - Bridge construction, grading, and paving. Intermittent lane closures and lane shifts. All directions are open to traffic. Could be some delay. For more information Click Here
last updated May 27
 
Roadwork - Interstate 535
Interstate 535: from Wisconsin State Line to I-35, US 53
bridge maintenance operations, width limit in effect, right lane closed Width limit 10 ' 0 " — starting 8:00 AM, 09/07/10 until September 8
Comment: Bridge inspection, daytime restriction only.

last updated August 30
 
Roadwork - US 2
US 2: from Polk County Road 9 to Polk County Road 46
roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance -- a mandatory speed limit is in force Width limit 8 ' 6 "
Comment: Eastbound traffic will crossover to westbound lane, creating a two-way two-lane highway for 6,520 feet. This will remain in effect until further notice. US 2 is being reconstructed due to a landslide in 2008.

last updated June 15
 
Roadwork - US 2
US 2: from Skyline Drive to I-35
entrance ramp closed, road construction — until October 22
Comment: WB TH 2 ramp to SB I-35 is closed, detour to 1st St. to 40th Avenue West to I-35 NB or use Blatnik Bridge.

last updated July 27
 
Roadwork - US 10
US 10 in both directions: from after MN 228 to before MN 78
bridge maintenance operations, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " — until today at about 5:00 PM CDT
Comment: Bridge painting on Highway 10 Westbountd and Eastbound west of Perham under Bridge 56021A in Otter Tail County

last updated August 20
 
Roadwork - US 10
US 10 in both directions: from MN 15 to Sherburne County Road 20
road construction, paving operations, roadway reduced to one lane Width limit 10 ' 0 " — until December 1
Comment: Lane closures and multiple staging. Grading, concrete surfacing, bituminous overlay, light/signal systems. For more information Click Here

last updated July 6
 
Roadwork - US 10
US 10 in both directions: from Sherburne County Road 43 to 185th Avenue
road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect Width limit 8 ' 6 ", Height limit 13 ' 6 ", No vehicles over 80000 lbs from 07:00am CDT to 07:00pm CDT on weekdays — until December 1
Comment: Highway 10 - from Big Lake to Elk River - Mill and Overlay - starting in mid August til approximately mid November. No permits on the construction project. Please visit for more information

last updated August 12
 
Roadwork - US 14
US 14 in both directions: from after US 914A to before US 914A
road closed, major road construction, width limit in effect -- detour in operation Width limit 12 ' 0 " — until October 16
Comment: TH 14 is detoured from Waseca County Road 17 and Waseca County Road 14 . between Janesville and Waseca Follow the detour signs and be aware while driving in the work zone.

last updated August 4
 
Roadwork - US 14
US 14 westbound: from I-35 to Steele County Road 45
major road construction, exit ramp closed, closed for vehicles with permits -- detour in operation — starting 3:00 PM, 09/24/10 until September 26
Comment: The ramp from westbound Highway 14 to northbound Interstate 35 will close each weekend through September beginning Friday, August 13. Detour: Steele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Motorist needing to continue on Highway 14 west should stay on Steele County Road 34 west/26th Street northwest, to 24th Ave. Northwest, and back to Highway 14 toward Mankato. The ramp closure is necessary to reduce traffic back-ups on I-35 northbound during peak weekend travel times. The extended closure is needed to replace a culvert on the ramp.

last updated August 10
 
Roadwork - US 14
US 14 westbound: from I-35 to Steele County Road 45
major road construction, exit ramp closed, closed for vehicles with permits -- detour in operation — starting 3:00 PM, 09/17/10 until September 19
Comment: The ramp from westbound Highway 14 to northbound Interstate 35 will close each weekend through September beginning Friady, August 13. Detour: Steele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Motorist needing to continue on Highway 14 west should stay on Steele County Road 34 west/26th Street Northwest, to 24th Ave. northwest, and back to Highway 14 west toward Mankato. The ramp closure is necessary to reduce traffic back-ups on I-35 northbound during peak weekend travel times. The extended closure is needed to replace a culvert on the ramp.

last updated August 10
 
Roadwork - US 14
US 14: from I-35 to Steele County Road 45
major road construction, exit ramp closed, closed for vehicles with permits — starting 3:00 PM, 09/10/10 until September 12
Comment: The ramp from westbound Highwya 14 to norothbound Interstate 35 will close each weekend through September beginning Friday, August 13. Detour:Seele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Mortorist needing to continue on Highway 14 west should stay on Steele County Road 34west/26th Street Northwest, to 24th ave. Northwest, and back to Highway 14 west toward Mankato.

last updated August 10
 
Roadwork - US 14
US 14: at I-35
exit ramp closed, entrance ramp closed, closed for vehicles with permits because of construction work -- detour in operation — until November 5
Comment: Detour Rotes: Westbound Hwy 14 to Southbound I-35 ramp traffic will be detoured South on County 45 and West on Hwy 30 Northbound I-35 to Eastbound Hwy 14 traffic will be detoured east on Hwy 30 and North on County 45

last updated April 26
 
Roadwork - US 14
US 14 westbound: at Steele County Road 45
major road construction, exit ramp closed, closed for vehicles with permits -- detour in operation — starting 3:00 PM, 09/03/10 until Monday, at about 9:00 PM CDT
Comment: The ramp from westbound Highway 14 to northbound Interstate 35 will close each weekend through September beginning Friday, August 13. Detour: Steele County Road 180 west, to Steele County Road 43, north to Steele County 8 west, continue on Steele County Road 34 west, and back to I-35 north. Motorist needing to continue on Highway 14 west should stay on Steele County Road 34 west/26th Street Northwest, to 24th Ave. Northwest, and back to Highway 14 west toward Mankato. The ramp closure is necessary to reduce traffice back-ups on I-35 northbound during peak weekend travel times. The extended closure is needed to replace a culvert on the ramp.

last updated August 10
 
Roadwork - US 14
US 14 westbound: from US 52 to Olmsted County Road 36
roadway reduced to one lane, road maintenance operations —

last updated August 3
 
Roadwork - US 52
US 52 in both directions: from I-90 to US 63
roadway reduced to one lane, bridge maintenance operations, width limit in effect, length limit in effect Width limit 9 ' 0 ", Vehicle length limit 75.0 ft — until October 15
Comment: SP 5507-58 TH52 from 0.26 miles east of TH63 to 0.52 miles east of CSAH 1 Bridge rehabilitation on four bridges over CSAH 1 and Willow Creek

last updated July 6
 
Roadwork - US 52
US 52 in both directions: from MN 60 to before Goodhue County Road 9
roadway reduced to one lane, road reconstruction, width limit in effect Width limit 8 ' 6 " — until today at about 5:00 PM CDT
Comment: Acceleration and turn lane construction on Highway 52 from 3350' North of Highway 57 to 1200' north of the south junction of highway 60.

last updated July 26
 
Roadwork - US 59
US 59: from after Yellow Medicine County Road 3 to before MN 67
road construction -- detour in operation, follow the detour signs — until September 30
Comment: Shoulder widening and culvert lining.

last updated August 26
 
Roadwork - US 61
US 61 in both directions: from Winona County Road 15 to before Winona County Road 32
roadway reduced to one lane, road maintenance operations, width limit in effect Width limit 12 ' 0 " — until October 1
Comment: Bituminous Mill and Overlay, Pipe and Culvert Repairs - Intermittent lane closures and flaggers

last updated July 27
 
Roadwork - US 61
US 61: from after Wabasha County Road 4 to US 63
road closed, water main work, width limit in effect, length limit in effect Width limit 16 ' 0 ", Vehicle length limit 75.0 ft — starting 6:00 AM, 09/13/10 until October 1
Comment: City will be doing an open cut storm sewer project - Highway 61 will be open on weekends on a gravel surface at the intersection Dwelle Street and Highway 61

last updated yesterday at 2:33 PM CDT
 
Roadwork - US 71
US 71 in both directions: from Cottonwood County Road 25 to before MN 60
road closed, bridge construction, width limit in effect -- detour in operation, follow the signs Width limit 12 ' 0 " — until October 15
Comment: Bridge Replacement Windom TH 71 South: Outhbound detour from TH 71 onto Cottonwood County 17, south to Jackson County 30, east to rejoin TH 71.

last updated July 28
 
Roadwork - US 71
US 71: from after Hubbard County Road 44 to MN 197, US 2
bridge construction, traffic restrictions in force because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force Width limit 11 ' 0 ", No vehicles over 80000 lbs — until June 15, 2011
Comment: On Hwy 197 in Bemidji to 1.7 miles south - Lane width restrictions, intermittent flag person, minor traffic delays. Detour on Hwy 71 starts July 6 through late August 2010. Detour: Hubbard Co.Rd. 9 north to Hubbard Co. Rd. 98 , then east to Beltrami Co. Rd. 2 to Hwy 71. SB traffic will use the same detour in reverse.DETOUR is posted for 9 Ton. Hwy 71 project home page

last updated July 6
 
Roadwork - US 71
US 71: from Beltrami County Road 2 to MN 197, US 2
work on underground services, road open to traffic
Comment: Utility Relocations. May be lane closures and minor delays. On MN 197 from County Rd 50 to Hwy 71S junction Beltrami County Rd 2.

last updated June 24
 
Roadwork - US 75
US 75: from after Norman County Road 51 to before Norman County Road 48
road closed, bridge construction, gross weight limit in effect -- detour in operation, follow the detour signs — until September 30
Comment: This project is one half mile south of Shelly on US 75. Legal weight on detour route. Detour as follows: Northbound 75 traffic at the Jct. of US 75 and Hwy 200 will go east for 14 miles on Hwy 200 to the jct. of Hwy 9, then north on Hwy 9 for 16 miles to the jct. of Polk county 1, go west for 13 miles on county 1 to the jct. of US 75. Southbound traffic will do the reverse.

last updated June 24
 
Roadwork - US 169
US 169: at MN 18
road construction, width limit in effect — until September 30
Comment: Bituminous mill & overlay, turn lane construction, culvet repair & replacement..TH169 .23 miles North of Garrison to TH210 in Aitkin. !2' width restriction. Lane closures, Flaggers & Pilot Car.

last updated August 13
 
Roadwork - US 169
US 169: from Itasca County Road 10 to MN 65
road closed to traffic, road construction, width limit in effect — until September 13
Comment: On TH 169 from Calumet to Pengilly , traffic will be detoured to CSAH 12 to TH 65 north to Pengilly.

last updated August 17
 
Roadwork - US 169
US 169: from MN 65 to MN 65
road construction, width limit in effect, paving operations -- look out for flaggers, observe signs Width limit 12 ' 0 " — until October 30
Comment: On TH 169 between Pengilly and Keewatin, milling and culvert replacement on the four lane section. Daytime lane closures with flaggers.

last updated July 21
 
Roadwork - MN 1
MN 1: from after MN 89 to before MN 89
bridge construction, road construction, roadway reduced to one lane, slow traffic -- look out for flaggers, a mandatory speed limit is in force — until October 30
Comment: Grading/new bridge over Sandy River. Traffic restricted to one lane ,speed reduced to 15 mph from Aug 4-31st, from 7am - 7pm andmay include Sundays.

last updated August 5
 
Roadwork - MN 11
MN 11: from after MN 72 to before Koochiching County Road 4
bridge construction, roadway reduced to one lane, width limit in effect -- drive carefully, a mandatory speed limit is in force Speed limit 30 MPH, Width limit 10 ' 0 " — until October 15
Comment: Replacing bridges and approaches. Traffic lane will be reduced to 12 feet wide with 10-foot restrictions on vehicles w/permits. Stop lights in place. 7 mi. E of Baudette at Clementson.

last updated June 24
 
Roadwork - MN 11
MN 11: from after Koochiching County Road 4 to before Koochiching County Road 82
road construction, speed restrictions in force, width limit in effect, road closed to traffic -- detour in operation Width limit 10 ' 0 ", Speed limit 30 MPH — until November 5
Comment: Frontier Landing to Indus in Koochiching Co. Grading, reclaimation, shoulder widening, culvert replacement, paving. From Aug 23-Sept. 2 full-closure will be in effect and detour must be used.... Starting Sept. 3 to Sunday Sept. 19 full-closure is lifted temporarily... DETOUR: Baudette EB traffic to Hwy 72 S. to Hwy 1 E to Hwy 71 N to Pelland. WB traffic will follow same detour in reverse.

last updated September 1
 
Roadwork - MN 13
MN 13 southbound: from I-90 to MN 30
road construction, width limit in effect because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 31
Comment: Bituminous Mill & Overlay

last updated August 3
 
Roadwork - MN 16
MN 16: from MN 76 to MN 44
road closed, road maintenance operations, closed for vehicles with permits -- detour in operation — until September 15
Comment: Detour route: Take Highway 76 to Houston County 9 to Houston County 21 to Highway 16 - No overdimension loads are permitted on the detour.

last updated June 8
 
Roadwork - MN 19
MN 19 eastbound: from MN 13 to MN 3
major road construction, width limit in effect, single line traffic - alternating directions -- pilot car in operation Width limit 10 ' 0 " — until September 15

last updated July 9
 
Roadwork - MN 23
MN 23: from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33
road construction -- detour in operation, follow the detour signs Vehicle length limit 75.0 ft, Height limit 13 ' 6 ", Width limit 8 ' 6 ", No vehicles over 80000 lbs — until October 31
Comment: Construct four-lane segments, pedestrian underpass, surfacing, lighting and signals.

last updated August 26
 
Roadwork - MN 23
MN 23: from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43
road construction — until September 17, 2012
Comment: Construct a four-lane divided highway bypass of Paynesville to include bridges and lighting.

last updated August 26
 
Roadwork - MN 27
MN 27: from Morrison County Road 45 to MN 25
road closed to traffic, bridge construction -- detour in operation — until October 1
Comment: Reconstruction of Platte River Bridge, 3 miles West of Genola. Detour North of project via Morrison Co 45, Morrison County 43 and Morrison County Road 255. Legal Load Permits only per Morrison County. Detour Map: http://www.state.dot.mn.us/d3newsrel/2010/detours/Hwy27platteriverbridgedetour.pdf

last updated June 22
 
Roadwork - MN 37
MN 37: from US 169 to Lind Road - County Road 452
road closed to traffic, road construction, width limit in effect -- follow the detour signs — until Tuesday, at about 8:00 AM CDT
Comment: In HIbbing on TH 37 traffic will be detoured to North Dublin Road to Dupont Road to Tapala Road. Loads wider than 14' will need District approval.

last updated August 31
 
Roadwork - MN 58
MN 58: from after US 52 to Goodhue County Road 6
road closed, bridge construction, closed for vehicles with permits — until September 28
Comment: Detour Route: Goodhue County Road 10 to Goodhue County Road 48 to Goodhue County Road 4 and back to Highway 58

last updated June 8
 
Roadwork - MN 60
MN 60: from Nobles County Road 4 to before US 59
new road layout -- trucks are entering the roadway — until November 6
Comment: Milemarker 2-9. New road construction near old involving heavy equipment.

last updated April 6
 
Roadwork - MN 60
MN 60 eastbound: from I-90 to Jackson County Road 13
road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits Width limit 8 ' 6 " — until October 10
Comment: SP 3204-64 Bituminous Mill and Overlay TH 60 EBL Worthington to Wilder. 2-way traffic on west bound lanes from Worthington to Heron Lake. Over-width & Over-length loads not permitted.

last updated August 19
 
Roadwork - MN 60
MN 60 westbound: from MN 13 to MN 21
road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " — until October 15
Comment: Grading, Bituminous Mill & Overlay and Culvert Repairs

last updated August 3
 
Roadwork - MN 61
MN 61: from I-35 to Saint Louis County Road 281
bridge construction, road closed to traffic, width limit in effect, length limit in effect -- follow the detour signs Width limit 12 ' 0 " — until Tuesday, at about 8:00 AM CDT
Comment: In Duluth at the Lester River bridge, traffic will be detoured from 60th Avenue East to Superior Street.

last updated August 31
 
Roadwork - MN 61
MN 61 in both directions: from after Lake County Road 106 to before Lake County Road 4
road construction, width limit in effect Width limit 14 ' 0 ", Advisory speed limit 45 MPH — until October 30
Comment: Between Two Harbors and Beaver Bay single lane traffic with flaggers. Expect delays. Watch for contractor trucks entering and leaving the construction zone.

last updated August 16
 
Roadwork - MN 61
MN 61: at South Junction with County Road 59
road construction, width limit in effect, roadway reduced to one lane -- look out for flaggers Width limit 14 ' 0 " — until today at about 6:00 PM CDT
Comment: Grand Marias to Grand Portage single lane closures with flaggers.

last updated July 28
 
Roadwork - MN 65
MN 65 in both directions: from MN 23 to MN 27
road construction, paving operations, width limit in effect, road closed -- detour in operation, follow the detour signs Width limit 12 ' 6 " — until October 15
Comment: Putting in culverts, grading, reclamation & surfacing. Road is open to local traffic only. 12' 6" wide permit restriction on detour route - which is truck route - 23 - 47 - 27. The detour adds approximately 25 miles. Note: The construction ends at the southern intersection with TH 27 . For more information Click Here

last updated August 25
 
Roadwork - MN 65
MN 65: from US 169 to MN 1
road construction, width limit in effect, gross weight limit in effect, roadway reduced to one lane Width limit 10 ' 0 " — until October 29
Comment: From Nashwauk to Togo, daytime lane closures with flaggers. LEGAL WEIGHTS ONLY.

last updated July 21
 
Roadwork - MN 66
MN 66 in both directions: after Blue Earth County Road 9
road closed, width limit in effect, road maintenance operations -- detour in operation, follow the signs Width limit 12 ' 0 " — starting 7:00 AM, 09/07/10 until September 21
Comment: Hwy 66 south of Mankato: Access available to Red Jacket Trail Park from County Road 90. Detours are Blue Earth County Roads 90, 33 and 9. Follow signs.

last updated August 31
 
Roadwork - MN 68
MN 68: from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B
road construction -- detour in operation, follow the detour signs Width limit 11 ' 0 ", Axle weight limit 20000 lbs — until October 8
Comment: Type of work: mill and overlay, sanitary and storm sewer

last updated August 26
 
Roadwork - MN 87
MN 87: from after Becker County Road 29 - County Road 30 to Becker County Road 50
road closed, work on underground services -- detour in operation, follow the detour signs — starting 8:00 AM, 09/07/10 until October 15
Comment: Project located in Frazee. Highway 87/Lake Street will be closed between Main Avenue and Maple Avenue. Traffic will be detoured using Birch Avenue, Fifth Street, Becker County Road 10 and Highway 10.

last updated yesterday at 1:07 PM CDT
 
Roadwork - MN 95
MN 95 in both directions: from Mille Lacs County Road 29 to Mille Lacs County Road 122
road construction, bridge construction, road reconstruction, width limit in effect, length limit in effect, height limit in effect -- detour in operation, follow the detour signs Width limit 8 ' 6 ", Vehicle length limit 85.0 ft, Height limit 13 ' 6 " — until November 18
Comment: Replacing bridge on TH 95 over Rum River and constructing a roundabout at CSAH 29 intersection. For more information Click Here Detour route: 95 - Mille Lacs CR 1 - Mille Lacs CR 13 - TH 169; no overwidth, overheight, overlength on detour route - cs

last updated July 21
 
Roadwork - MN 123
MN 123: from Pine County Road 30 to MN 23
road closed to traffic, road construction -- detour in operation — until September 10
Comment: On TH 123 between Sandstone and Askov traffic will be detoured to Pine Cty Rd 30 , to Pine County Rd 142 into Askov, Pine Cty Rd 32 and then onto MN TH 23.

last updated July 30
 
Roadwork - MN 135
MN 135: from MN 37 to MN 1
road construction, width limit in effect, single line traffic - alternating directions Width limit 12 ' 0 " — until Tuesday, at about 8:00 AM CDT
Comment: On TH 135 between Gilbert and Tower, various sections of the highway will be reduced to one lane for culvert repair.

last updated August 31
 
Roadwork - MN 135
MN 135: from Saint Louis County Road 409 to MN 1
new road construction layout, width limit in effect -- look out for flaggers, entire intersection, near the lake Width limit 12 ' 0 " —
Comment: In Tower by Lake Vermilion, traffic will be switched onto a bypass for TH 135 during TH1/TH169 roadway and bridge construction.

last updated August 2
 
Roadwork - MN 200
MN 200: at MN 6
road maintenance operations, width limit in effect, roadway reduced to one lane, short delays -- pilot car in operation, look out for flaggers — starting 6:00 AM, 09/13/10 until September 24
Comment: In Cass County from BR 11005in Outing on TH # 6 to West Jct. TH 200 in Remer. MM 38.450 - 55.783, project length 17.3. Bituminous mill & overlay. One lane traffic daylight hours. 10 feet width restriction.

last updated September 1
 
Roadwork - MN 220
MN 220: from Polk County Road 19 to MN 1
road construction, short delays -- look out for flaggers, pilot car in operation Width limit 11 ' 0 " — for the next two months
Comment: During the Milling and paving operations, traffic will be guided through the construction zone using lane closures and flagmen.

last updated August 30

© 2000-2008 Minnesota Department of Transportation
395 John Ireland Boulevard St. Paul, MN 55155-1899
Phone: 800/657-3774 800/627-3529 (TTY, Voice, ASCII)
This site best viewed with 1024X768 or greater and
with Netscape 4.7 or Internet Explorer 4.5 or greater.

A to Z | Getting Around | About Mn/DOT | Disclaimer and legal | Doing Business | Contact Mn/DOT | News Room | 511 Traveler Service | Careers/Jobs |Northstar | Governor's Site |

Zoom In To Minneapolis/St. Paul Area
road closed to traffic, road construction, width limit in effect on US 169 from Itasca County Road 10 to MN 65 — until September 13 last updated August 17
road closed, bridge construction, width limit in effect on US 71 in both directions from Cottonwood County Road 25 to before MN 60 -- detour in operation, follow the signs — until October 15 last updated July 28
road closed to traffic, road construction on MN 123 from Pine County Road 30 to MN 23 -- detour in operation — until September 10 last updated July 30
road construction, paving operations, width limit in effect, road closed on MN 65 in both directions from MN 23 to MN 27 -- detour in operation, follow the detour signs — until October 15 last updated August 25
road closed to traffic, road construction, width limit in effect on MN 37 from US 169 to Lind Road - County Road 452 -- follow the detour signs — until Tuesday, at about 8:00 AM CDT last updated August 31
road closed, width limit in effect, road maintenance operations on MN 66 in both directions after Blue Earth County Road 9 -- detour in operation, follow the signs — starting 7:00 AM, 09/07/10 until September 21 last updated August 31
road closed to traffic, bridge construction on MN 27 from Morrison County Road 45 to MN 25 -- detour in operation — until October 1 last updated June 22
road closed, major road construction, width limit in effect on US 14 in both directions from after US 914A to before US 914A -- detour in operation — until October 16 last updated August 4
road closed, work on underground services on MN 87 from after Becker County Road 29 - County Road 30 to Becker County Road 50 -- detour in operation, follow the detour signs — starting 8:00 AM, 09/07/10 until October 15 last updated yesterday at 1:07 PM CDT
bridge construction, road closed to traffic, width limit in effect, length limit in effect on MN 61 from I-35 to Saint Louis County Road 281 -- follow the detour signs — until Tuesday, at about 8:00 AM CDT last updated August 31
road closed, water main work, width limit in effect, length limit in effect on US 61 from after Wabasha County Road 4 to US 63 — starting 6:00 AM, 09/13/10 until October 1 last updated yesterday at 2:33 PM CDT
major road construction, width limit in effect, speed restrictions in force, roadway reduced to one lane on Interstate 35 from Exit 249 Boundary Avenue to Exit 256A Mesaba Avenue -- trucks are recommended to avoid the area, drive with extreme caution — until October 30 last updated yesterday at 1:30 PM CDT
road closed, bridge construction, gross weight limit in effect on US 75 from after Norman County Road 51 to before Norman County Road 48 -- detour in operation, follow the detour signs — until September 30 last updated June 24
road closed, road maintenance operations, closed for vehicles with permits on MN 16 from MN 76 to MN 44 -- detour in operation — until September 15 last updated June 8
road closed, bridge construction, closed for vehicles with permits on MN 58 from after US 52 to Goodhue County Road 6 — until September 28 last updated June 8
road construction, speed restrictions in force, width limit in effect, road closed to traffic on MN 11 from after Koochiching County Road 4 to before Koochiching County Road 82 -- detour in operation — until November 5 last updated September 1
bridge closed, bridge maintenance operations on Interstate 35 in both directions between MN 19 and Exit 76 Deuce Road — starting 5:00 AM, 09/07/10 for the next month last updated August 30
bridge construction, roadway reduced to one lane, width limit in effect on MN 11 from after MN 72 to before Koochiching County Road 4 -- drive carefully, a mandatory speed limit is in force — until October 15 last updated June 24
bridge construction on Interstate 35 at MN 95 — until November 1 last updated June 24
road construction, paving operations, roadway reduced to two lanes, closed for vehicles with permits, width limit in effect, height limit in effect, gross weight limit in effect on US 10 in both directions from Sherburne County Road 43 to 185th Avenue — until December 1 last updated August 12
bridge maintenance operations, roadway reduced to one lane, width limit in effect on US 10 in both directions from after MN 228 to before MN 78 — until today at about 5:00 PM CDT last updated August 20
bridge construction, road construction, roadway reduced to one lane, slow traffic on MN 1 from after MN 89 to before MN 89 -- look out for flaggers, a mandatory speed limit is in force — until October 30 last updated August 5
major road construction, exit ramp closed, closed for vehicles with permits on US 14 westbound at Steele County Road 45 -- detour in operation — starting 3:00 PM, 09/03/10 until Monday, at about 9:00 PM CDT last updated August 10
roadway reduced to one lane, bridge maintenance operations, width limit in effect, length limit in effect on US 52 in both directions from I-90 to US 63 — until October 15 last updated July 6
roadway reduced to one lane, major road construction, width limit in effect, length limit in effect on Interstate 90 from Exit 175 Oakland Avenue West to Exit 181 28th Street Northeast — until October 15 last updated April 16
bridge construction, traffic restrictions in force on US 71 from after Hubbard County Road 44 to MN 197, US 2 because the route is temporarily closed to trucks with permits -- detour in operation, look out for flaggers, a mandatory speed limit is in force — until June 15, 2011 last updated July 6
road construction, width limit in effect on MN 13 southbound from I-90 to MN 30 because the roadway is reduced to one lane -- pilot car in operation, look out for flaggers — until October 31 last updated August 3
road construction, roadway reduced to one lane, width limit in effect on MN 60 westbound from MN 13 to MN 21 -- pilot car in operation, look out for flaggers — until October 15 last updated August 3
major road construction, exit ramp closed, closed for vehicles with permits on US 14 westbound from I-35 to Steele County Road 45 -- detour in operation — starting 3:00 PM, 09/24/10 until September 26 last updated August 10
entrance ramp closed, road construction on US 2 from Skyline Drive to I-35 — until October 22 last updated July 27
road construction, paving operations, roadway reduced to one lane on US 10 in both directions from MN 15 to Sherburne County Road 20 — until December 1 last updated July 6
road construction, roadway reduced to one lane, width limit in effect on Interstate 90 westbound from after MN 56 to MN 16 — until September 15 last updated July 9
roadway reduced to one lane, single line traffic - alternating directions, major road construction, closed for vehicles with permits on Interstate 35 in both directions from after Exit 32 Steele County Road 4 to Exit 41 Bridge Street -- consider using an alternate route — until September 14 last updated July 27
road construction, width limit in effect, gross weight limit in effect, roadway reduced to one lane on MN 65 from US 169 to MN 1 — until October 29 last updated July 21
major road construction, exit ramp closed, closed for vehicles with permits on US 14 westbound from I-35 to Steele County Road 45 -- detour in operation — starting 3:00 PM, 09/17/10 until September 19 last updated August 10
bridge construction, roadway reduced to one lane on Interstate 35 at MN 95 last updated June 29
entrance ramp closed, major road construction on Interstate 35 southbound from Exit 252 Central Avenue to US 2 — until October 30 last updated July 27
roadway reduced to one lane, road reconstruction, width limit in effect on US 52 in both directions from MN 60 to before Goodhue County Road 9 — until today at about 5:00 PM CDT last updated July 26
roadway reduced to one lane, road maintenance operations on US 14 westbound from US 52 to Olmsted County Road 36 — last updated August 3
exit ramp closed, road construction on Interstate 35 from Exit 175 Pine County Road 14 to North Junction with County Road 61 -- detour in operation — until September 8 last updated yesterday at 1:43 PM CDT
major road construction, exit ramp closed, closed for vehicles with permits on US 14 from I-35 to Steele County Road 45 — starting 3:00 PM, 09/10/10 until September 12 last updated August 10
roadway reduced to one lane, road maintenance operations, width limit in effect on US 61 in both directions from Winona County Road 15 to before Winona County Road 32 — until October 1 last updated July 27
road construction, width limit in effect, roadway reduced to one lane on MN 61 at South Junction with County Road 59 -- look out for flaggers — until today at about 6:00 PM CDT last updated July 28
road maintenance operations, width limit in effect, roadway reduced to one lane, short delays on MN 200 at MN 6 -- pilot car in operation, look out for flaggers — starting 6:00 AM, 09/13/10 until September 24 last updated September 1
road construction, roadway reduced to two lanes, width limit in effect, closed for vehicles with permits on MN 60 eastbound from I-90 to Jackson County Road 13 — until October 10 last updated August 19
road construction, bridge construction, delays on Interstate 94 in both directions from Exit 183 Wright County Road 8 to Exit 195 Wright County Road 75 — until December 15 last updated May 27
major road construction, width limit in effect, single line traffic - alternating directions on MN 19 eastbound from MN 13 to MN 3 -- pilot car in operation — until September 15 last updated July 9
road construction, width limit in effect, single line traffic - alternating directions on MN 135 from MN 37 to MN 1 — until Tuesday, at about 8:00 AM CDT last updated August 31
roadway reduced to two lanes, width limit in effect, single line traffic - alternating directions on Interstate 35 in both directions from Exit 209 Pine County Road 46 to Exit 227 Carlton County Road 4 — until September 15 last updated yesterday at 1:34 PM CDT
exit ramp closed, entrance ramp closed, closed for vehicles with permits on US 14 at I-35 because of construction work -- detour in operation — until November 5 last updated April 26
roadway reduced to two lanes, width limit in effect, long term road construction, emergency maintenance on US 2 from Polk County Road 9 to Polk County Road 46 -- a mandatory speed limit is in force last updated June 15
road construction on US 59 from after Yellow Medicine County Road 3 to before MN 67 -- detour in operation, follow the detour signs — until September 30 last updated August 26
road construction, bridge construction, road reconstruction, width limit in effect, length limit in effect, height limit in effect on MN 95 in both directions from Mille Lacs County Road 29 to Mille Lacs County Road 122 -- detour in operation, follow the detour signs — until November 18 last updated July 21
exit ramp closed, major road construction on Interstate 35 at I-535, US 53 — until October 30 last updated July 27
road maintenance operations on Interstate 90 in both directions from after MN 4 to before Exit 128 -- trucks are entering the roadway — starting 7:00 AM, 09/08/10 until October 5 last updated August 6
bridge maintenance operations, width limit in effect, right lane closed on Interstate 535 from Wisconsin State Line to I-35, US 53 — starting 8:00 AM, 09/07/10 until September 8 last updated August 30
road construction on MN 68 from after Lyon County Road 1B to before Lyon County Road 8A - County Road 5B -- detour in operation, follow the detour signs — until October 8 last updated August 26
new road construction layout, width limit in effect on MN 135 from Saint Louis County Road 409 to MN 1 -- look out for flaggers, entire intersection, near the lake — last updated August 2
road construction, width limit in effect, paving operations on US 169 from MN 65 to MN 65 -- look out for flaggers, observe signs — until October 30 last updated July 21
work on underground services, road open to traffic on US 71 from Beltrami County Road 2 to MN 197, US 2 last updated June 24
road construction, width limit in effect on US 169 at MN 18 — until September 30 last updated August 13
road construction, short delays on MN 220 from Polk County Road 19 to MN 1 -- look out for flaggers, pilot car in operation — for the next two months last updated August 30
road construction on MN 23 from after Lyon County Road 15 - County Road 2 to before Lyon County Road 33 -- detour in operation, follow the detour signs — until October 31 last updated August 26
road construction, width limit in effect on MN 61 in both directions from after Lake County Road 106 to before Lake County Road 4 — until October 30 last updated August 16
road construction on MN 23 from after South Junction with County Road 66 to before Stearns County Road 12 - County Road 43 — until September 17, 2012 last updated August 26
road construction, width limit in effect, right lane closed on Interstate 35 southbound from MN 45 to Exit 242 Carlton County Road 1 — starting 6:00 AM, 09/07/10 until October 15 last updated yesterday at 1:52 PM CDT
new road layout on MN 60 from Nobles County Road 4 to before US 59 -- trucks are entering the roadway — until November 6 last updated April 6
Home Home About 511 About 511 Contact Contact Newsroom Newsroom Helpful Hints Helpful Hints